Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CEILING MATERIAL FALL PREVENTION STRUCTURE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a ceiling material fall prevention structure construction method capable of easily installing a locking member even if a ceiling is high.SOLUTION: A ceiling material fall prevention structure construction method is used for a ceiling with an attic space enough for work. The method comprises: a line suspending process to suspend a lift-up line member 20 downward from an open hole formed on a ceiling plate 5; a fitting process to fit a locking member 10 to the suspended lift-up line member 20; a lift-up process to lift up the locking member 10 by pulling up the lift-up line member 20 from the attic and lock the locking member on a surface of the ceiling plate 5; and a fixing process to fix the lifted locking member 10 to a fixing system in the attic.SELECTED DRAWING: Figure 4
【課題】天井高が大きい場合であっても、容易に係止部材を設置することができる天井材落下防止構造の施工方法を提供する。【解決手段】天井裏で作業可能な空間を備えた天井での天井材落下防止構造の施工方法であって、天井板5に形成された貫通孔から引上用ライン部材20を下方に垂らすライン垂下工程と、垂らされた引上用ライン部材20に係止部材10を取り付ける取付工程と、引上用ライン部材20を天井裏から引っ張り係止部材10を引き上げて天井板5の表面に係止させる引上工程と、引き上げた係止部材10を天井裏の固定系に固定する固定工程とを備えた。【選択図】図4
CEILING MATERIAL FALL PREVENTION STRUCTURE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a ceiling material fall prevention structure construction method capable of easily installing a locking member even if a ceiling is high.SOLUTION: A ceiling material fall prevention structure construction method is used for a ceiling with an attic space enough for work. The method comprises: a line suspending process to suspend a lift-up line member 20 downward from an open hole formed on a ceiling plate 5; a fitting process to fit a locking member 10 to the suspended lift-up line member 20; a lift-up process to lift up the locking member 10 by pulling up the lift-up line member 20 from the attic and lock the locking member on a surface of the ceiling plate 5; and a fixing process to fix the lifted locking member 10 to a fixing system in the attic.SELECTED DRAWING: Figure 4
【課題】天井高が大きい場合であっても、容易に係止部材を設置することができる天井材落下防止構造の施工方法を提供する。【解決手段】天井裏で作業可能な空間を備えた天井での天井材落下防止構造の施工方法であって、天井板5に形成された貫通孔から引上用ライン部材20を下方に垂らすライン垂下工程と、垂らされた引上用ライン部材20に係止部材10を取り付ける取付工程と、引上用ライン部材20を天井裏から引っ張り係止部材10を引き上げて天井板5の表面に係止させる引上工程と、引き上げた係止部材10を天井裏の固定系に固定する固定工程とを備えた。【選択図】図4
CEILING MATERIAL FALL PREVENTION STRUCTURE CONSTRUCTION METHOD
天井材落下防止構造の施工方法
ARAI TOMOKAZU (Autor:in)
12.01.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CEILING BOARD FALL PREVENTION STRUCTURE AND CEILING BOARD FALL PREVENTION METHOD
Europäisches Patentamt | 2019
|