PROBLEM TO BE SOLVED: To provide a rustproof structure of an anchor bolt and a rust prevention method for an anchor bolt that block penetration of outside air and rainwater into a peripheral edge around a root of an anchor bolt, thereby sufficiently preventing rusting of the anchor bolt.SOLUTION: A rustproof structure of an anchor bolt has a hollow part 6 formed on a base plate 3, through which an anchor bolt 4 may be inserted. A sponge material 13 is provided on an outer periphery of the hollow part 6, which is also an installation surface of the base plate 3 to a foundation part 1. The base plate 3 is installed on a foundation part 1 and the base plate 3 is tightened toward the foundation part 1 using a nut 9 for compressing the sponge material 13, and a filler material is injected into the hollow part 6 at the same time. The filler material injected into the hollow part 6 permeates into the sponge material 13 placed on the outer periphery of the hollow part 6 and is cured along with time, thereby blocking penetration of the outdoor air and rainwater into the peripheral part around the root part of the anchor bolt 4.SELECTED DRAWING: Figure 4
【課題】アンカーボルトの付根部周縁への外気や雨水の浸入を遮断し、アンカーボルトの錆の発生を充分に防止するアンカーボルトの防錆構造、及びアンカーボルトの防錆方法を提供する。【解決手段】アンカーボルトの防錆構造は、ベースプレート3にアンカーボルト4が挿通可能な空洞部6が形成されている。また、ベースプレート3の基礎部1への設置面であって、空洞部6の外周にはスポンジ材13が配置されている。ベースプレート3を基礎部1に対して設置し、ナット9でベースプレート3を基礎部1の方向に締め付け、スポンジ材13を圧潰させるとともに、空洞部6に充填材を注入する。空洞部6に注入された充填材は、空洞部6の外周に配置されたスポンジ材13に浸透し、時間の経過とともに硬化するため、アンカーボルト4の付根部周縁への外気や雨水の浸入が遮断される。【選択図】図4
RUSTPROOF STRUCTURE OF ANCHOR BOLT, AND RUST PREVENTION METHOD FOR ANCHOR BOLT
PROBLEM TO BE SOLVED: To provide a rustproof structure of an anchor bolt and a rust prevention method for an anchor bolt that block penetration of outside air and rainwater into a peripheral edge around a root of an anchor bolt, thereby sufficiently preventing rusting of the anchor bolt.SOLUTION: A rustproof structure of an anchor bolt has a hollow part 6 formed on a base plate 3, through which an anchor bolt 4 may be inserted. A sponge material 13 is provided on an outer periphery of the hollow part 6, which is also an installation surface of the base plate 3 to a foundation part 1. The base plate 3 is installed on a foundation part 1 and the base plate 3 is tightened toward the foundation part 1 using a nut 9 for compressing the sponge material 13, and a filler material is injected into the hollow part 6 at the same time. The filler material injected into the hollow part 6 permeates into the sponge material 13 placed on the outer periphery of the hollow part 6 and is cured along with time, thereby blocking penetration of the outdoor air and rainwater into the peripheral part around the root part of the anchor bolt 4.SELECTED DRAWING: Figure 4
【課題】アンカーボルトの付根部周縁への外気や雨水の浸入を遮断し、アンカーボルトの錆の発生を充分に防止するアンカーボルトの防錆構造、及びアンカーボルトの防錆方法を提供する。【解決手段】アンカーボルトの防錆構造は、ベースプレート3にアンカーボルト4が挿通可能な空洞部6が形成されている。また、ベースプレート3の基礎部1への設置面であって、空洞部6の外周にはスポンジ材13が配置されている。ベースプレート3を基礎部1に対して設置し、ナット9でベースプレート3を基礎部1の方向に締め付け、スポンジ材13を圧潰させるとともに、空洞部6に充填材を注入する。空洞部6に注入された充填材は、空洞部6の外周に配置されたスポンジ材13に浸透し、時間の経過とともに硬化するため、アンカーボルト4の付根部周縁への外気や雨水の浸入が遮断される。【選択図】図4
RUSTPROOF STRUCTURE OF ANCHOR BOLT, AND RUST PREVENTION METHOD FOR ANCHOR BOLT
アンカーボルトの防錆構造、及びアンカーボルトの防錆方法
OKAMURA TOSHIHIRO (Autor:in) / KIDO HIDEAKI (Autor:in) / INOUE HIROSHI (Autor:in)
12.01.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Anchor bolt installing structure and anchor bolt installing method
Europäisches Patentamt | 2020
|ANCHOR BOLT TIGHTENING STRUCTURE, AND METHOD FOR TIGHTENING ANCHOR BOLT
Europäisches Patentamt | 2019
|AUXILIARY TOOL FOR ANCHOR BOLT, ANCHOR BOLT SET, AND INSTALLATION METHOD FOR ANCHOR BOLT
Europäisches Patentamt | 2016
|