Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
HOOK BOLT AND HOOK BOLT UNIT
PROBLEM TO BE SOLVED: To provide a hook bolt and a hook bolt unit such that relaxation of fastening force is suppressed with the hook bolt fixing a bridge girder and a bridge tie.SOLUTION: A hook bolt 2 comprises a linear shaft part 21 and a hook part 22 connecting with one end of the shaft part 21, and a bridge girder B and a bridge tie S are fixed by inserting the shaft part 21 into the bridge tie S while making the hook part 22 abut on a lower surface of the bridge girder B and fastening nuts 5, 6 to the shaft part 21. The hook part 22 is formed in such a shape that after the hook part is bent at one end of the shaft part 21 to extend around the shaft part 21 in a plane F orthogonal to an axial direction of the shaft part 21, a tip part 221 abutting on the bridge tie S swells to the side of the shaft part 21.SELECTED DRAWING: Figure 2
【課題】橋桁と橋まくらぎとを固定するフックボルトで、締結力の緩みを抑制するフックボルト及びフックボルトユニットを提供する。【解決手段】フックボルト2は、直線状の軸部21と、軸部21の一端に連続するフック部22とを備え、フック部22を橋桁Bの下面に当接させつつ軸部21を橋まくらぎSに挿通させて軸部21にナット5,6を締結することにより、橋桁Bと橋まくらぎSとを固定する。フック部22は、軸部21の一端から屈曲して、軸部21の軸方向と直交する平面F内で軸部21の周りを回るように延出した後に、橋まくらぎSと当接する先端部221が軸部21側に隆起した形状に形成されている。【選択図】図2
HOOK BOLT AND HOOK BOLT UNIT
PROBLEM TO BE SOLVED: To provide a hook bolt and a hook bolt unit such that relaxation of fastening force is suppressed with the hook bolt fixing a bridge girder and a bridge tie.SOLUTION: A hook bolt 2 comprises a linear shaft part 21 and a hook part 22 connecting with one end of the shaft part 21, and a bridge girder B and a bridge tie S are fixed by inserting the shaft part 21 into the bridge tie S while making the hook part 22 abut on a lower surface of the bridge girder B and fastening nuts 5, 6 to the shaft part 21. The hook part 22 is formed in such a shape that after the hook part is bent at one end of the shaft part 21 to extend around the shaft part 21 in a plane F orthogonal to an axial direction of the shaft part 21, a tip part 221 abutting on the bridge tie S swells to the side of the shaft part 21.SELECTED DRAWING: Figure 2
【課題】橋桁と橋まくらぎとを固定するフックボルトで、締結力の緩みを抑制するフックボルト及びフックボルトユニットを提供する。【解決手段】フックボルト2は、直線状の軸部21と、軸部21の一端に連続するフック部22とを備え、フック部22を橋桁Bの下面に当接させつつ軸部21を橋まくらぎSに挿通させて軸部21にナット5,6を締結することにより、橋桁Bと橋まくらぎSとを固定する。フック部22は、軸部21の一端から屈曲して、軸部21の軸方向と直交する平面F内で軸部21の周りを回るように延出した後に、橋まくらぎSと当接する先端部221が軸部21側に隆起した形状に形成されている。【選択図】図2
HOOK BOLT AND HOOK BOLT UNIT
フックボルト及びフックボルトユニット
NOMOTO KOICHI (Autor:in) / MURAKOSHI MASARU (Autor:in) / WAKATSUKI OSAMU (Autor:in) / TAKAHASHI TAKESHI (Autor:in)
19.01.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
/
E01B
PERMANENT WAY
,
Gleisoberbau
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile