WATER PASSING DUCT CONSTRUCTION METHOD AND DRAINAGE DISCHARGE CHANNEL
PROBLEM TO BE SOLVED: To propose a water passing duct construction method that enables a drainage channel requiring no electric power to be formed by forming a water passing duct underground, and to propose such a drainage discharge channel.SOLUTION: A water passing duct construction method comprises: a duct forming process to form a duct reaching underwater by boring natural ground using an auger screw 4 and disposing a casing 5 in the natural ground; a duct plug process to form a duct plug 7 that blocks the casing 5 at a tip part of the auger screw 4 in a state where excavated soil 6 is stored in the casing 5; and a collection process to collect the auger screw 4. A drainage discharge channel is formed by the water passing duct construction method.SELECTED DRAWING: Figure 2
【課題】地中に通水路を形成することで電力等を必要としない排水路を形成することを可能とした通水路の施工方法および水抜き排水路を提案する。【解決手段】オーガースクリュー4を用いて地山を掘削するとともにケーシング5を地山に配設することで水中に到達する管路を形成する管路形成工程と、ケーシング5内に掘削土6を溜めた状態で、オーガースクリュー4の先端部においてケーシング5を閉塞する管栓7を形成する管栓工程と、オーガースクリュー4を回収する回収工程とを備える通水路の施工方法およびこれにより形成された水抜き排水路。【選択図】図2
WATER PASSING DUCT CONSTRUCTION METHOD AND DRAINAGE DISCHARGE CHANNEL
PROBLEM TO BE SOLVED: To propose a water passing duct construction method that enables a drainage channel requiring no electric power to be formed by forming a water passing duct underground, and to propose such a drainage discharge channel.SOLUTION: A water passing duct construction method comprises: a duct forming process to form a duct reaching underwater by boring natural ground using an auger screw 4 and disposing a casing 5 in the natural ground; a duct plug process to form a duct plug 7 that blocks the casing 5 at a tip part of the auger screw 4 in a state where excavated soil 6 is stored in the casing 5; and a collection process to collect the auger screw 4. A drainage discharge channel is formed by the water passing duct construction method.SELECTED DRAWING: Figure 2
【課題】地中に通水路を形成することで電力等を必要としない排水路を形成することを可能とした通水路の施工方法および水抜き排水路を提案する。【解決手段】オーガースクリュー4を用いて地山を掘削するとともにケーシング5を地山に配設することで水中に到達する管路を形成する管路形成工程と、ケーシング5内に掘削土6を溜めた状態で、オーガースクリュー4の先端部においてケーシング5を閉塞する管栓7を形成する管栓工程と、オーガースクリュー4を回収する回収工程とを備える通水路の施工方法およびこれにより形成された水抜き排水路。【選択図】図2
WATER PASSING DUCT CONSTRUCTION METHOD AND DRAINAGE DISCHARGE CHANNEL
通水路の施工方法および水抜き排水路
MORITA TAIJI (Autor:in)
26.01.2017
Patent
Elektronische Ressource
Japanisch
Steel structure water passing channel system and construction method thereof
Europäisches Patentamt | 2024
|Anti-passing drainage pipe roadbed junction differential settlement device and construction method