Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To provide a steel slit dam constructed in a ravine and a river of mountain land, and preventing a disaster by capturing a boulder and drift wood caused in boulder flow time and large flood time or damping (denergizing) a boulder flow.SOLUTION: A slit structure 2 is composed of columns 3 and 4 erected at an interval between an upstream side position A and a downstream side position B in the flow direction of a river, a lateral girth 5 for connecting the mutual adjacent upstream side columns 3 and 3 and a top end girth 6 for connecting the upper end vicinity of the longitudinal upstream side column 3 and downstream side column 4, and the mutual adjacent downstream side columns 5 and 5 are not connected. An upper end position of the downstream side column 4 is set in a lower position than an upper end position of the upstream side column 3, and the top end girth 6 is slantingly provided in a downward gradient θ to the downstream side B from the upstream side A.SELECTED DRAWING: Figure 2
【課題】山間地の渓谷や河川等に構築され、土石流時、大洪水時に発生する巨礫や流木などを捕捉し、或いは土石流を減衰(減勢)させて災害を未然に防止する鋼製スリットダムを提供する。【解決手段】スリット構造体2は、河川の流れ方向における上流側位置Aと下流側位置Bとに間隔を開けて立てた支柱3、4と、隣接する上流側支柱3、3同士を連結した横繋ぎ材5と、前後する上流側支柱3及び下流側支柱4の上端近傍を連結した天端繋ぎ材6とから成り、隣接する下流側支柱5、5同士は連結されていない。下流側支柱4の上端位置は、上流側支柱3の上端位置よりも低い位置とされ、天端繋ぎ材6は、上流側Aから下流側Bへ下る勾配θに傾斜させて設けられている。【選択図】図2
PROBLEM TO BE SOLVED: To provide a steel slit dam constructed in a ravine and a river of mountain land, and preventing a disaster by capturing a boulder and drift wood caused in boulder flow time and large flood time or damping (denergizing) a boulder flow.SOLUTION: A slit structure 2 is composed of columns 3 and 4 erected at an interval between an upstream side position A and a downstream side position B in the flow direction of a river, a lateral girth 5 for connecting the mutual adjacent upstream side columns 3 and 3 and a top end girth 6 for connecting the upper end vicinity of the longitudinal upstream side column 3 and downstream side column 4, and the mutual adjacent downstream side columns 5 and 5 are not connected. An upper end position of the downstream side column 4 is set in a lower position than an upper end position of the upstream side column 3, and the top end girth 6 is slantingly provided in a downward gradient θ to the downstream side B from the upstream side A.SELECTED DRAWING: Figure 2
【課題】山間地の渓谷や河川等に構築され、土石流時、大洪水時に発生する巨礫や流木などを捕捉し、或いは土石流を減衰(減勢)させて災害を未然に防止する鋼製スリットダムを提供する。【解決手段】スリット構造体2は、河川の流れ方向における上流側位置Aと下流側位置Bとに間隔を開けて立てた支柱3、4と、隣接する上流側支柱3、3同士を連結した横繋ぎ材5と、前後する上流側支柱3及び下流側支柱4の上端近傍を連結した天端繋ぎ材6とから成り、隣接する下流側支柱5、5同士は連結されていない。下流側支柱4の上端位置は、上流側支柱3の上端位置よりも低い位置とされ、天端繋ぎ材6は、上流側Aから下流側Bへ下る勾配θに傾斜させて設けられている。【選択図】図2
STEEL SLIT DAM
鋼製スリットダム
KOKURYO HIROSHI (Autor:in)
23.02.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
STEEL PIPE JOINT STRUCTURE OF STEEL SLIT DAM, AND STEEL SLIT DAM
Europäisches Patentamt | 2023
|