Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
MOLD CONSTRUCTION METHOD AND MOLD STRUCTURE
PROBLEM TO BE SOLVED: To provide a mold construction method and a mold structure that enable a timbering to be removed readily after constructing a caisson skeleton.SOLUTION: A mold construction method includes a step for installing a caisson edge hardware 4 and an outer mold 6 on a leveled bottom plate G, and a step for constructing a timbering 7 on an inner peripheral side of the outer mold 6. The step for constructing the timbering 7 includes a step for installing a plurality of skeletal members 10, and a step for installing a cushioning material 11 in a gap between the skeletal members 10, the cushioning material containing a fluid inside. After forming a caisson skeleton 2, the skeletal member 10 is released by removing the fluid inside the cushioning material 11. Then, the timbering is removed readily only by removing each of the skeletal members 10 from a work chamber 3.SELECTED DRAWING: Figure 2
【課題】ケーソン躯体の形成後に支保工を容易に撤去することができる型枠構築方法、及び型枠構造物を提供する。【解決手段】型枠構築方法は、整地された底盤Gに刃口金物4及び外型枠6を設置する工程と、外型枠6の内周側に支保工7を構築する工程と、を備える。支保工7を構築する工程は、複数の骨組部材10を設置する工程と、骨組部材10間の隙間へ、内部に流体が収容される緩衝材11を設置する工程と、を備える。ケーソン躯体2を形成した後は、緩衝材11の内部から流体を除去することで、骨組部材10の固定を解除し、個々の骨組部材10を作業室3から撤去するだけの作業で容易に支保工を撤去することができる。【選択図】図2
MOLD CONSTRUCTION METHOD AND MOLD STRUCTURE
PROBLEM TO BE SOLVED: To provide a mold construction method and a mold structure that enable a timbering to be removed readily after constructing a caisson skeleton.SOLUTION: A mold construction method includes a step for installing a caisson edge hardware 4 and an outer mold 6 on a leveled bottom plate G, and a step for constructing a timbering 7 on an inner peripheral side of the outer mold 6. The step for constructing the timbering 7 includes a step for installing a plurality of skeletal members 10, and a step for installing a cushioning material 11 in a gap between the skeletal members 10, the cushioning material containing a fluid inside. After forming a caisson skeleton 2, the skeletal member 10 is released by removing the fluid inside the cushioning material 11. Then, the timbering is removed readily only by removing each of the skeletal members 10 from a work chamber 3.SELECTED DRAWING: Figure 2
【課題】ケーソン躯体の形成後に支保工を容易に撤去することができる型枠構築方法、及び型枠構造物を提供する。【解決手段】型枠構築方法は、整地された底盤Gに刃口金物4及び外型枠6を設置する工程と、外型枠6の内周側に支保工7を構築する工程と、を備える。支保工7を構築する工程は、複数の骨組部材10を設置する工程と、骨組部材10間の隙間へ、内部に流体が収容される緩衝材11を設置する工程と、を備える。ケーソン躯体2を形成した後は、緩衝材11の内部から流体を除去することで、骨組部材10の固定を解除し、個々の骨組部材10を作業室3から撤去するだけの作業で容易に支保工を撤去することができる。【選択図】図2
MOLD CONSTRUCTION METHOD AND MOLD STRUCTURE
型枠構築方法、及び型枠構造物
NISHIO AKIRA (Autor:in) / UEDA AKIRO (Autor:in)
16.03.2017
Patent
Elektronische Ressource
Japanisch
Europäisches Patentamt | 2016
|MOLD FRAME DEVICE FOR CONCRETE STRUCTURE AND MOLD FRAME CONSTRUCTION METHOD FOR CONCRETE STRUCTURE
Europäisches Patentamt | 2021
|Secondary structure construction shaping mold and construction method
Europäisches Patentamt | 2024
|Double-hoop outer mold pipe gallery construction mold
Europäisches Patentamt | 2024
|