EARTH RETAINING EXCAVATION METHOD AND SKELETON CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a skeleton construction method capable of sufficiently shortening a construction period.SOLUTION: A skeleton construction method according to this invention comprises: (A) a process to construct a pair of earth retaining walls facing each other underground; (B) a process to excavate the foundation between the pair of earth retaining walls and sequentially install multiple supporting, which support the earth retaining walls that become exposed due to excavation of the foundation; and (C) a process to construct a skeleton in a space between the pair of earth retaining walls after completing the excavation of the foundation in (B) process. Short struts and anchors are combined as the multiple supporting.SELECTED DRAWING: Figure 4
【課題】十分な工期短縮を実現できる躯体構築方法を提供する。【解決手段】本発明に係る躯体構築方法は、(A):対面する一対の山留壁を地中に構築する工程と、(B):上記一対の山留壁の間の地盤を掘削するとともに、地盤の掘削に伴って露出する山留壁を支える複数の支保工を順次設置する工程と、(C):上記(B)工程の地盤の掘削完了後、上記一対の山留壁の間の空間に躯体を構築する工程とを含み、上記複数の支保工として切梁とアンカーとを併用する。【選択図】図4
EARTH RETAINING EXCAVATION METHOD AND SKELETON CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a skeleton construction method capable of sufficiently shortening a construction period.SOLUTION: A skeleton construction method according to this invention comprises: (A) a process to construct a pair of earth retaining walls facing each other underground; (B) a process to excavate the foundation between the pair of earth retaining walls and sequentially install multiple supporting, which support the earth retaining walls that become exposed due to excavation of the foundation; and (C) a process to construct a skeleton in a space between the pair of earth retaining walls after completing the excavation of the foundation in (B) process. Short struts and anchors are combined as the multiple supporting.SELECTED DRAWING: Figure 4
【課題】十分な工期短縮を実現できる躯体構築方法を提供する。【解決手段】本発明に係る躯体構築方法は、(A):対面する一対の山留壁を地中に構築する工程と、(B):上記一対の山留壁の間の地盤を掘削するとともに、地盤の掘削に伴って露出する山留壁を支える複数の支保工を順次設置する工程と、(C):上記(B)工程の地盤の掘削完了後、上記一対の山留壁の間の空間に躯体を構築する工程とを含み、上記複数の支保工として切梁とアンカーとを併用する。【選択図】図4
EARTH RETAINING EXCAVATION METHOD AND SKELETON CONSTRUCTION METHOD
山留掘削工法及び躯体構築方法
TAKA NAOTO (Autor:in) / MUKAI HISASHI (Autor:in)
01.06.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
JIG FOR EXCAVATION AND CONSTRUCTION METHOD OF EARTH RETAINING STRUCTURE
Europäisches Patentamt | 2021
|REINFORCEMENT METHOD OF EARTH RETAINING AROUND EXCAVATION SITE
Europäisches Patentamt | 2019
|EARTH RETAINING STRUCTURE AND EARTH RETAINING CONSTRUCTION METHOD
Europäisches Patentamt | 2021
|Earth retaining system for excavation in Japan
British Library Conference Proceedings | 1995
|EARTH RETAINING PANEL, EARTH RETAINING STRUCTURE, AND EARTH RETAINING STRUCTURE CONSTRUCTION METHOD
Europäisches Patentamt | 2024
|