JOINING METHOD OF PRECAST FLOOR SLAB AND JOINING STRUCTURE OF PRECAST FLOOR SLAB
PROBLEM TO BE SOLVED: To further facilitate joining operation of precast floor slabs when joining two or more precast floor slabs.SOLUTION: In an arrangement step, each of the end surfaces 14 of a pair of precast floor slabs 10 having hollow recesses 12 in end surfaces 14 is made to face each other so as to be positioned to a flange top surface 2 of a steel beam 1 in a plan view. In a joining step, the pair of precast floor slabs 10 and the steel beam 1 are joined to each other by filling a filler 8 in the recess 12. The flange top surface 2 of the steel beam 1 becomes a substitute for a formwork to eliminate the need of the formwork. In the arrangement step, a stud dowel 3 projecting from the flange top surface 2 of the steel beam 1 is contained in the recess 12 in a plan view, and therefore the precast floor slab 10 can be prevented from being shifted in the direction being parallel to the end surface 14 after the joining step. Accordingly, the joining operation of the precast floor slabs 10 becomes simpler when joining two or more precast floor slabs 10.SELECTED DRAWING: Figure 2
【課題】複数枚のプレキャスト床版同士を接合する際に、プレキャスト床版の接合作業をより簡易にする。【解決手段】配置工程では、平面視において端面14に窪んだ凹部12を有する一対のプレキャスト床版10の端面14のそれぞれを鋼桁1のフランジ上面2に位置するように互いに対向させ、接合工程では、凹部12の中に充填材8を充填することにより一対のプレキャスト床版10及び鋼桁1を互いに接合する。鋼桁1のフランジ上面2が型枠の替りとなり、型枠が不要となる。配置工程では、鋼桁1のフランジ上面2から突出したスタッドジベル3が平面視において凹部12の中に入るようにするため、接合工程後にプレキャスト床版10が端面14に平行な方向にずれることを防止することができる。したがって、複数枚のプレキャスト床版10同士を接合する際に、プレキャスト床版10の接合作業がより簡易となる。【選択図】図2
JOINING METHOD OF PRECAST FLOOR SLAB AND JOINING STRUCTURE OF PRECAST FLOOR SLAB
PROBLEM TO BE SOLVED: To further facilitate joining operation of precast floor slabs when joining two or more precast floor slabs.SOLUTION: In an arrangement step, each of the end surfaces 14 of a pair of precast floor slabs 10 having hollow recesses 12 in end surfaces 14 is made to face each other so as to be positioned to a flange top surface 2 of a steel beam 1 in a plan view. In a joining step, the pair of precast floor slabs 10 and the steel beam 1 are joined to each other by filling a filler 8 in the recess 12. The flange top surface 2 of the steel beam 1 becomes a substitute for a formwork to eliminate the need of the formwork. In the arrangement step, a stud dowel 3 projecting from the flange top surface 2 of the steel beam 1 is contained in the recess 12 in a plan view, and therefore the precast floor slab 10 can be prevented from being shifted in the direction being parallel to the end surface 14 after the joining step. Accordingly, the joining operation of the precast floor slabs 10 becomes simpler when joining two or more precast floor slabs 10.SELECTED DRAWING: Figure 2
【課題】複数枚のプレキャスト床版同士を接合する際に、プレキャスト床版の接合作業をより簡易にする。【解決手段】配置工程では、平面視において端面14に窪んだ凹部12を有する一対のプレキャスト床版10の端面14のそれぞれを鋼桁1のフランジ上面2に位置するように互いに対向させ、接合工程では、凹部12の中に充填材8を充填することにより一対のプレキャスト床版10及び鋼桁1を互いに接合する。鋼桁1のフランジ上面2が型枠の替りとなり、型枠が不要となる。配置工程では、鋼桁1のフランジ上面2から突出したスタッドジベル3が平面視において凹部12の中に入るようにするため、接合工程後にプレキャスト床版10が端面14に平行な方向にずれることを防止することができる。したがって、複数枚のプレキャスト床版10同士を接合する際に、プレキャスト床版10の接合作業がより簡易となる。【選択図】図2
JOINING METHOD OF PRECAST FLOOR SLAB AND JOINING STRUCTURE OF PRECAST FLOOR SLAB
プレキャスト床版の接合方法及びプレキャスト床版の接合構造
ICHINOMIYA TOSHIMICHI (Autor:in) / FUJISHIRO MASARU (Autor:in) / TARUYA SACHIKO (Autor:in) / TAIRA YOHEI (Autor:in) / ONO TOSHIO (Autor:in) / SAITO KIMIO (Autor:in) / KANEHARU HIDESADA (Autor:in) / KOSAKA TAKASHI (Autor:in)
08.06.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
PRECAST FLOOR SLAB JOINT STRUCTURE AND METHOD FOR JOINING PRECAST FLOOR SLAB JOINT
Europäisches Patentamt | 2024
|PRECAST FLOOR SLAB JOINT STRUCTURE AND PRECAST FLOOR SLAB
Europäisches Patentamt | 2021
|PRECAST FLOOR SLAB INSTALLATION METHOD AND PRECAST FLOOR SLAB
Europäisches Patentamt | 2018
|