Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR INSTALLING SUSPENDED SCAFFOLD ON BRIDGE STRUCTURE AND FLOAT ATTACHED SUSPENDED SCAFFOLD
PROBLEM TO BE SOLVED: To provide a suspended scaffold which can be easily installed on a bridge.SOLUTION: A method for installing a suspended scaffold on a bridge structure comprises the processes to: prepare a float attached suspended scaffold 1 with a float section 2 fixed to a lower side of the suspended scaffold section; transfer the float attached suspended scaffold 1, with the same floating on water, to under a bridge structure 100 on which the float attached suspended scaffold 1 is installed; connect the float attached suspended scaffold 1 to first bridge side faces on both sides of the bridge structure 100 through first wires 26; and suspend the float attached suspended scaffold 1 from the bridge structure 100 by pulling up the same with the first wires 26.SELECTED DRAWING: Figure 1
【課題】容易に橋梁に架設可能な吊足場を提供する。【解決手段】橋梁構造物における足場の架設方法であって、吊足場部の下側にフロート部2を固定したフロート付き吊足場1を準備する工程と、フロート付き吊足場1を架設の対象となる橋梁構築物100の下方まで、水上に浮かべて移動させる工程と、橋梁構造物100の両側の側面の第一橋梁側面位置にフロート付き吊足場1を第一ワイヤ26で接続する工程と、第一ワイヤ26を引き上げて、フロート付き吊足場1を橋梁構造物100に吊す工程とを含む。【選択図】図1
METHOD FOR INSTALLING SUSPENDED SCAFFOLD ON BRIDGE STRUCTURE AND FLOAT ATTACHED SUSPENDED SCAFFOLD
PROBLEM TO BE SOLVED: To provide a suspended scaffold which can be easily installed on a bridge.SOLUTION: A method for installing a suspended scaffold on a bridge structure comprises the processes to: prepare a float attached suspended scaffold 1 with a float section 2 fixed to a lower side of the suspended scaffold section; transfer the float attached suspended scaffold 1, with the same floating on water, to under a bridge structure 100 on which the float attached suspended scaffold 1 is installed; connect the float attached suspended scaffold 1 to first bridge side faces on both sides of the bridge structure 100 through first wires 26; and suspend the float attached suspended scaffold 1 from the bridge structure 100 by pulling up the same with the first wires 26.SELECTED DRAWING: Figure 1
【課題】容易に橋梁に架設可能な吊足場を提供する。【解決手段】橋梁構造物における足場の架設方法であって、吊足場部の下側にフロート部2を固定したフロート付き吊足場1を準備する工程と、フロート付き吊足場1を架設の対象となる橋梁構築物100の下方まで、水上に浮かべて移動させる工程と、橋梁構造物100の両側の側面の第一橋梁側面位置にフロート付き吊足場1を第一ワイヤ26で接続する工程と、第一ワイヤ26を引き上げて、フロート付き吊足場1を橋梁構造物100に吊す工程とを含む。【選択図】図1
METHOD FOR INSTALLING SUSPENDED SCAFFOLD ON BRIDGE STRUCTURE AND FLOAT ATTACHED SUSPENDED SCAFFOLD
橋梁構造物における吊足場の架設方法及びフロート付き吊足場
EZAKI IKUO (Autor:in)
15.06.2017
Patent
Elektronische Ressource
Japanisch
SUSPENDED SCAFFOLD AND METHOD FOR INSTALLING SUSPENDED SCAFFOLD
Europäisches Patentamt | 2023
|DEVICE FOR INSTALLING SUSPENDED SCAFFOLD AND METHOD FOR INSTALLING SUSPENDED SCAFFOLD
Europäisches Patentamt | 2023
|SUSPENDED SCAFFOLD FOR BRIDGE MAINTENANCE AND METHOD FOR INSTALLING SAME
Europäisches Patentamt | 2015
|SUSPENDED SCAFFOLD EQUIPMENT AND SUSPENDED SCAFFOLD OPERATION METHOD
Europäisches Patentamt | 2022
|