Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To provide a crimp metal fitting for roof by which a seam insertion clearance is secured between a crimp opposing parts in a state where a fastening bolt is temporarily fastened, and which is set to a seam part on a roof while keeping such a temporarily fastened state and can perform final fastening fixture.SOLUTION: An interposing body 6 is provided between a pair of crimp bodies 1, and a clearance holding projection 7 is provided protrusively in the crimp body 1 towards the interposing body 6. The interposing body 6 includes an abutment part 8 to which the clearance holding projection 7 is abutted. When the clearance holding projection 7 is abutted to the abutment part 8, the pair of crimp bodies 1 is held in a separate state, and a seam insertion clearance 9 is formed between the crimp opposing parts 3. The interposing body 6 includes a broken part 10 which is broken by bringing the clearance holding projection 7 into contact therewith when a fastening bolt 2 is fastened, and the interposing body 6 includes a crimp allowable approach part 11 that the clearance holding projection 7 which has broken the broken part 10 approaches.SELECTED DRAWING: Figure 5
【課題】締め付けボルトを仮締めした状態で挟持対向部間にはぜ挿入間隙が確保され、この仮締め状態のまま屋根上のはぜ部にセットして本締め固定作業を行うことができる屋根用挟持金具を提供すること。【解決手段】一対の挟持体1間に介在体6を設け、介在体6に向けて挟持体1に間隙保持凸部7を突設し、間隙保持凸部7が突き当たる突き当たり部8を介在体6に設け、突き当たり部8に間隙保持凸部7が突き当たると一対の挟持体1が離反状態に保持されて挟持対向部3間にはぜ挿入間隙9を形成する構成とし、締め付けボルト2を締め付けた際に間隙保持凸部7が接して破損する被破損部10を介在体6に設け、被破損部10を破損した間隙保持凸部7が進入する挟持許容進入部11を介在体6に設ける。【選択図】図5
PROBLEM TO BE SOLVED: To provide a crimp metal fitting for roof by which a seam insertion clearance is secured between a crimp opposing parts in a state where a fastening bolt is temporarily fastened, and which is set to a seam part on a roof while keeping such a temporarily fastened state and can perform final fastening fixture.SOLUTION: An interposing body 6 is provided between a pair of crimp bodies 1, and a clearance holding projection 7 is provided protrusively in the crimp body 1 towards the interposing body 6. The interposing body 6 includes an abutment part 8 to which the clearance holding projection 7 is abutted. When the clearance holding projection 7 is abutted to the abutment part 8, the pair of crimp bodies 1 is held in a separate state, and a seam insertion clearance 9 is formed between the crimp opposing parts 3. The interposing body 6 includes a broken part 10 which is broken by bringing the clearance holding projection 7 into contact therewith when a fastening bolt 2 is fastened, and the interposing body 6 includes a crimp allowable approach part 11 that the clearance holding projection 7 which has broken the broken part 10 approaches.SELECTED DRAWING: Figure 5
【課題】締め付けボルトを仮締めした状態で挟持対向部間にはぜ挿入間隙が確保され、この仮締め状態のまま屋根上のはぜ部にセットして本締め固定作業を行うことができる屋根用挟持金具を提供すること。【解決手段】一対の挟持体1間に介在体6を設け、介在体6に向けて挟持体1に間隙保持凸部7を突設し、間隙保持凸部7が突き当たる突き当たり部8を介在体6に設け、突き当たり部8に間隙保持凸部7が突き当たると一対の挟持体1が離反状態に保持されて挟持対向部3間にはぜ挿入間隙9を形成する構成とし、締め付けボルト2を締め付けた際に間隙保持凸部7が接して破損する被破損部10を介在体6に設け、被破損部10を破損した間隙保持凸部7が進入する挟持許容進入部11を介在体6に設ける。【選択図】図5
CRIMP METAL FITTING FOR ROOF
屋根用挟持金具
TAKAHASHI NOBUO (Autor:in)
29.06.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
METAL FITTING FOR ROOF AND SNOW STOPPING METAL FITTING FOR ROOF
Europäisches Patentamt | 2019
|