GROUT MATERIAL DETECTION METHOD
PROBLEM TO BE SOLVED: To provide a grout material detection method capable of reliably detecting whether or not a grout material is injected into a target place when injecting or placing the grout material such as a lubricant, a backfilling material and concrete into the ground.SOLUTION: When injecting or placing a grout material into a tail void section 11 in an outer peripheral section of a propulsion pipe or a segment in propulsion work to excavate the ground with a tunneling machine and install the propulsion pipe 20 or in shield tunnel construction to excavate the ground with the tunneling machine and install a segment, at least either conductance rates, electrical resistance or pH values before and after injecting or placing the grout material into the tail void section are measured and whether or not the grout material is injected or placed into the tail void section is detected through a change in measurement values before and after injecting or placing the grout material.SELECTED DRAWING: Figure 1
【課題】 地盤内において、滑材、裏込材、コンクリート等のグラウト材料を注入や打設等で施工した場合、施工したグラウト材料が目的の場所に注入されたか否かを確実に検知することが可能なグラウト材料の検知方法を提供する。【解決手段】 掘進機で地盤中を掘削し、推進管20を設置する推進工事又はセグメントを設置するシールド工事における、推進管外周部又はセグメント外周部のテールボイド部11にグラウト材料を注入又は打設する施工において、前記テールボイド部の前記グラウト材料を注入又は打設する前後の導電率、電気抵抗値、PHの少なくともいずれかを測定し、施工前後の前記測定値の変化により、前記テールボイド部に前記グラウト材料が注入されたか否かを検知することを特徴とする。【選択図】図1
GROUT MATERIAL DETECTION METHOD
PROBLEM TO BE SOLVED: To provide a grout material detection method capable of reliably detecting whether or not a grout material is injected into a target place when injecting or placing the grout material such as a lubricant, a backfilling material and concrete into the ground.SOLUTION: When injecting or placing a grout material into a tail void section 11 in an outer peripheral section of a propulsion pipe or a segment in propulsion work to excavate the ground with a tunneling machine and install the propulsion pipe 20 or in shield tunnel construction to excavate the ground with the tunneling machine and install a segment, at least either conductance rates, electrical resistance or pH values before and after injecting or placing the grout material into the tail void section are measured and whether or not the grout material is injected or placed into the tail void section is detected through a change in measurement values before and after injecting or placing the grout material.SELECTED DRAWING: Figure 1
【課題】 地盤内において、滑材、裏込材、コンクリート等のグラウト材料を注入や打設等で施工した場合、施工したグラウト材料が目的の場所に注入されたか否かを確実に検知することが可能なグラウト材料の検知方法を提供する。【解決手段】 掘進機で地盤中を掘削し、推進管20を設置する推進工事又はセグメントを設置するシールド工事における、推進管外周部又はセグメント外周部のテールボイド部11にグラウト材料を注入又は打設する施工において、前記テールボイド部の前記グラウト材料を注入又は打設する前後の導電率、電気抵抗値、PHの少なくともいずれかを測定し、施工前後の前記測定値の変化により、前記テールボイド部に前記グラウト材料が注入されたか否かを検知することを特徴とする。【選択図】図1
GROUT MATERIAL DETECTION METHOD
グラウト材料の検知方法
SATO TOSHIO (Autor:in) / USHIJIMA SAKAE (Autor:in) / MINATO TARO (Autor:in) / MITOME TAKAMITSU (Autor:in) / KUROKI HIROTADA (Autor:in) / IWAHARA KAZUNORI (Autor:in)
29.06.2017
Patent
Elektronische Ressource
Japanisch
UNDERWATER GROUT MATERIAL DETECTION SYSTEM, UNDERWATER GROUT MATERIAL DETECTION METHOD AND PROGRAM
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|