Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FLOORBOARD FIXING STRUCTURE AND FLOORBOARD FIXING TOOL
PROBLEM TO BE SOLVED: To provide a floorboard fixing structure and a floorboard fixing tool with which establishment/fixation operation of a floorboard may be efficiently carried out.SOLUTION: The floorboard fixing structure is a floorboard fixing structure in which a plurality of floorboards 4 placed on a beam flange 3 is fixed onto the beam flange 3 by a fixing tool equipped onto a through hole 4a formed on each floorboard 4. There are a first fixing structure part 100 fixed by a first floorboard fixing tool 1 equipped onto the through hole 4a positioned above the beam flange 3 (3A) and a second fixing structure part 200 fixed by a second floorboard fixing tool 2 equipped onto the through hole 4a positioned outside of an upper surface of the beam flange 3 (3B).SELECTED DRAWING: Figure 1
【課題】床板の設置固定作業を効率的に行うことができる床板固定構造および床板固定具を提供する。【解決手段】この床板固定構造は、梁フランジ3上に置かれた複数の床板4が、各床板4に形成されている貫通孔4aに装着された固定具によって、上記梁フランジ3に固定される床板固定構造であり、梁フランジ3(3A)の上側に位置する貫通孔4aに装着された第1床板固定具1により固定される第1固定構造部100と、梁フランジ3(3B)の上面外に位置する貫通孔4aに装着された第2床板固定具2により固定される第2固定構造部200とが混在する。【選択図】図1
FLOORBOARD FIXING STRUCTURE AND FLOORBOARD FIXING TOOL
PROBLEM TO BE SOLVED: To provide a floorboard fixing structure and a floorboard fixing tool with which establishment/fixation operation of a floorboard may be efficiently carried out.SOLUTION: The floorboard fixing structure is a floorboard fixing structure in which a plurality of floorboards 4 placed on a beam flange 3 is fixed onto the beam flange 3 by a fixing tool equipped onto a through hole 4a formed on each floorboard 4. There are a first fixing structure part 100 fixed by a first floorboard fixing tool 1 equipped onto the through hole 4a positioned above the beam flange 3 (3A) and a second fixing structure part 200 fixed by a second floorboard fixing tool 2 equipped onto the through hole 4a positioned outside of an upper surface of the beam flange 3 (3B).SELECTED DRAWING: Figure 1
【課題】床板の設置固定作業を効率的に行うことができる床板固定構造および床板固定具を提供する。【解決手段】この床板固定構造は、梁フランジ3上に置かれた複数の床板4が、各床板4に形成されている貫通孔4aに装着された固定具によって、上記梁フランジ3に固定される床板固定構造であり、梁フランジ3(3A)の上側に位置する貫通孔4aに装着された第1床板固定具1により固定される第1固定構造部100と、梁フランジ3(3B)の上面外に位置する貫通孔4aに装着された第2床板固定具2により固定される第2固定構造部200とが混在する。【選択図】図1
FLOORBOARD FIXING STRUCTURE AND FLOORBOARD FIXING TOOL
床板固定構造および床板固定具
YADA YOHEI (Autor:in) / TAKAI KATSUNORI (Autor:in)
29.06.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
FLOORBOARD FIXING STRUCTURE AND FLOORBOARD FIXING TOOL
Europäisches Patentamt | 2017
|