CONSTRUCTION APPARATUS FOR COPING CONCRETE BLOCK AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide a construction method for coping concrete block, in which it is not required to support bottom plate from lower side when a coping concrete block is placed onto upper edge part of a steel pile.SOLUTION: There is provided a construction method for a coping concrete block 15, comprising: a step of suspending a bottom plate with a hanger member on upper edge part of a steel pile 11 and attaching it along the steel pile 11 for partitioning the steel pile 11 from inner surface at one side of a concrete block 15; a step of placing the coping concrete block 15 onto an upper edge part 13 of the steel pile 11 with height adjusting means, and sealing a gap generated between onto one side inner surface and the bottom plate with a coping side fixing plate 35 fixed onto one side inner surface upon placing the coping concrete block 15; and a step of filling with hardening material a space surrounding the bottom plate placed along the steel pile 11, one side inner surface, top surface, the other side inner surface of the coping concrete block 15, and the other side ground.SELECTED DRAWING: Figure 1
【課題】笠コンクリートブロックを鋼矢板の上端部に配置する際に、底板を下から支える必要がない笠コンクリートブロックの施工工法を提供する。【解決手段】鋼矢板11とコンクリートブロック15の一側内面との間を仕切るために、鋼矢板11の上端部に吊り手部材を用いて底板を吊り下げ、鋼矢板11に沿って取り付ける工程、鋼矢板11の上端部13に高さ調節手段を用いて笠コンクリートブロック15を配置するとともに、笠コンクリートブロック15を配置する際に、その一側内面と底板との間に生じる隙間をなくすために、一側内面に固定した笠側固定板35を用いて上記隙間を塞ぐ工程、鋼矢板11に沿って取り付けられた底板と、笠コンクリートブロック15の一側内面、天面、他側内面及び他側地盤によって囲まれる空所に硬化材を充填する工程を経ることを特徴とする笠コンクリートブロック15の施工工法。【選択図】図1
CONSTRUCTION APPARATUS FOR COPING CONCRETE BLOCK AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide a construction method for coping concrete block, in which it is not required to support bottom plate from lower side when a coping concrete block is placed onto upper edge part of a steel pile.SOLUTION: There is provided a construction method for a coping concrete block 15, comprising: a step of suspending a bottom plate with a hanger member on upper edge part of a steel pile 11 and attaching it along the steel pile 11 for partitioning the steel pile 11 from inner surface at one side of a concrete block 15; a step of placing the coping concrete block 15 onto an upper edge part 13 of the steel pile 11 with height adjusting means, and sealing a gap generated between onto one side inner surface and the bottom plate with a coping side fixing plate 35 fixed onto one side inner surface upon placing the coping concrete block 15; and a step of filling with hardening material a space surrounding the bottom plate placed along the steel pile 11, one side inner surface, top surface, the other side inner surface of the coping concrete block 15, and the other side ground.SELECTED DRAWING: Figure 1
【課題】笠コンクリートブロックを鋼矢板の上端部に配置する際に、底板を下から支える必要がない笠コンクリートブロックの施工工法を提供する。【解決手段】鋼矢板11とコンクリートブロック15の一側内面との間を仕切るために、鋼矢板11の上端部に吊り手部材を用いて底板を吊り下げ、鋼矢板11に沿って取り付ける工程、鋼矢板11の上端部13に高さ調節手段を用いて笠コンクリートブロック15を配置するとともに、笠コンクリートブロック15を配置する際に、その一側内面と底板との間に生じる隙間をなくすために、一側内面に固定した笠側固定板35を用いて上記隙間を塞ぐ工程、鋼矢板11に沿って取り付けられた底板と、笠コンクリートブロック15の一側内面、天面、他側内面及び他側地盤によって囲まれる空所に硬化材を充填する工程を経ることを特徴とする笠コンクリートブロック15の施工工法。【選択図】図1
CONSTRUCTION APPARATUS FOR COPING CONCRETE BLOCK AND CONSTRUCTION METHOD THEREOF
笠コンクリートブロックの施工装置及びその施工方法
YAMADA TSUNEO (Autor:in) / FUJIWARA SHINGO (Autor:in)
20.07.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
CONSTRUCTION DEVICE FOR COPING CONCRETE BLOCK, AND CONSTRUCTION METHOD FOR THE SAME
Europäisches Patentamt | 2016
|DECK BLOCK USING CONCRETE BLOCK AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2017
|DECK BLOCK USING CONCRETE BLOCK AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2017
Underwater concrete block structure and construction method thereof