Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SIDE HEATER EQUIPMENT, HEATER OPERATION MANAGEMENT SYSTEM, AND HEATER OPERATION MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide side heater equipment or the like capable of being made into a simple construction and performing an operation management properly.SOLUTION: Side heater equipment 4 is mounted on a foundation 2 of the outer side of an underground tank 1, and controls the freezing range of the foundation 2 around the underground tank 1. The side heater equipment 4 includes: a heater pipe 43 for circulating hot water; a branch pipe 42 for feeding hot water from a header pipe 41 to the heater pipe 43; and a branch pipe 45a for recovering the hot water from the heater pipe 43 to a header pipe 46. In the side heater equipment 4, the branch pipe 45a is equipped with a thermometer 455 for measuring the temperature of the hot water flowing in the branch pipe 45a.SELECTED DRAWING: Figure 1
【課題】簡易な構成とでき、運転管理も好適に行える側部ヒータ設備等を提供する。【解決手段】側部ヒータ設備4は、地下タンク1の外側の地盤2に設けられ、地下タンク1の周囲の地盤2の凍結範囲をコントロールするものである。側部ヒータ設備4は、温水を循環させるためのヒータ管43、ヘッダー管41からヒータ管43に温水を供給する枝管42、ヒータ管43からヘッダー管46に温水を回収する枝管45aなどを有する。側部ヒータ設備4では、枝管45aに、枝管45aを流れる温水の温度を測定するための温度計455が設けられる。【選択図】図1
SIDE HEATER EQUIPMENT, HEATER OPERATION MANAGEMENT SYSTEM, AND HEATER OPERATION MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide side heater equipment or the like capable of being made into a simple construction and performing an operation management properly.SOLUTION: Side heater equipment 4 is mounted on a foundation 2 of the outer side of an underground tank 1, and controls the freezing range of the foundation 2 around the underground tank 1. The side heater equipment 4 includes: a heater pipe 43 for circulating hot water; a branch pipe 42 for feeding hot water from a header pipe 41 to the heater pipe 43; and a branch pipe 45a for recovering the hot water from the heater pipe 43 to a header pipe 46. In the side heater equipment 4, the branch pipe 45a is equipped with a thermometer 455 for measuring the temperature of the hot water flowing in the branch pipe 45a.SELECTED DRAWING: Figure 1
【課題】簡易な構成とでき、運転管理も好適に行える側部ヒータ設備等を提供する。【解決手段】側部ヒータ設備4は、地下タンク1の外側の地盤2に設けられ、地下タンク1の周囲の地盤2の凍結範囲をコントロールするものである。側部ヒータ設備4は、温水を循環させるためのヒータ管43、ヘッダー管41からヒータ管43に温水を供給する枝管42、ヒータ管43からヘッダー管46に温水を回収する枝管45aなどを有する。側部ヒータ設備4では、枝管45aに、枝管45aを流れる温水の温度を測定するための温度計455が設けられる。【選択図】図1
SIDE HEATER EQUIPMENT, HEATER OPERATION MANAGEMENT SYSTEM, AND HEATER OPERATION MANAGEMENT METHOD
側部ヒータ設備、ヒータ運転管理システムおよびヒータ運転管理方法
YASUNAGA MASAMICHI (Autor:in)
20.07.2017
Patent
Elektronische Ressource
Japanisch
Europäisches Patentamt | 2022
|CARBON HEATER AND METHOD OF MANUFACTURING CARBON HEATER
Europäisches Patentamt | 2017
|Demand side management of electric water heater with a photovoltaic system
BASE | 2018
|