Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CEILING BASE STRUCTURE AND CONSTRUCTION METHOD OF CEILING BASE STRUCTURE
PROBLEM TO BE SOLVED: To provide a ceiling clip and a ceiling base structure superior in workability capable of improving earthquake resistance, and a construction method of the ceiling base structure.SOLUTION: The ceiling base structure has a pair of boards 10A and 10B which are attached to a ceiling joist receiver 4. The pair of boards 10A and 10B includes a fixed part 18 which is fixed to a flange 62 (52) of an orthogonal cross member 6(5) which crosses the ceiling joist receiver 4 on the lower face thereof. The ceiling joist receiver 4 and the orthogonal cross member 6(5) are connected to each other. A pair of fixed parts 18 protrudes from both sides of the lower part 17 of the board in a direction perpendicular to the board. Each of the fixed parts 18, 18 is engaged with a lip part 63(53) in an upper part of the flange 62 (52), and fixed to the inner face of the flange 62 (52).SELECTED DRAWING: Figure 5
【課題】 耐震性の向上を図りながらも施工性に優れた天井用クリップ及び天井下地構造並びに天井下地構造の施工方法を提供すること。【解決手段】 野縁受4に取り付けられる一対の基板10A,10Bを有する。基板10A,10Bは野縁受4とその下面で交差する交差部材6(5)のフランジ62(52)に固定される固定部18を備える。野縁受4と交差部材6(5)とを連結する。固定部18は、基板下部17の両側から基板に直交する方向に各々張り出して一対設けられる。一対の固定部18,18は、各々がフランジ62(52)上部のリップ部63(53)に係合すると共にフランジ62(52)の内面に固定される。【選択図】 図5
CEILING BASE STRUCTURE AND CONSTRUCTION METHOD OF CEILING BASE STRUCTURE
PROBLEM TO BE SOLVED: To provide a ceiling clip and a ceiling base structure superior in workability capable of improving earthquake resistance, and a construction method of the ceiling base structure.SOLUTION: The ceiling base structure has a pair of boards 10A and 10B which are attached to a ceiling joist receiver 4. The pair of boards 10A and 10B includes a fixed part 18 which is fixed to a flange 62 (52) of an orthogonal cross member 6(5) which crosses the ceiling joist receiver 4 on the lower face thereof. The ceiling joist receiver 4 and the orthogonal cross member 6(5) are connected to each other. A pair of fixed parts 18 protrudes from both sides of the lower part 17 of the board in a direction perpendicular to the board. Each of the fixed parts 18, 18 is engaged with a lip part 63(53) in an upper part of the flange 62 (52), and fixed to the inner face of the flange 62 (52).SELECTED DRAWING: Figure 5
【課題】 耐震性の向上を図りながらも施工性に優れた天井用クリップ及び天井下地構造並びに天井下地構造の施工方法を提供すること。【解決手段】 野縁受4に取り付けられる一対の基板10A,10Bを有する。基板10A,10Bは野縁受4とその下面で交差する交差部材6(5)のフランジ62(52)に固定される固定部18を備える。野縁受4と交差部材6(5)とを連結する。固定部18は、基板下部17の両側から基板に直交する方向に各々張り出して一対設けられる。一対の固定部18,18は、各々がフランジ62(52)上部のリップ部63(53)に係合すると共にフランジ62(52)の内面に固定される。【選択図】 図5
CEILING BASE STRUCTURE AND CONSTRUCTION METHOD OF CEILING BASE STRUCTURE
天井下地構造及び天井下地構造の施工方法
KUMAMOTO TATSUMI (Autor:in) / HONDA SHINICHI (Autor:in)
27.07.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CEILING BASE MEMBER, CEILING STRUCTURE, BUILDING, AND CONSTRUCTION METHOD OF BUILDING
Europäisches Patentamt | 2023
|CEILING BASE MATERIAL CONNECTOR AND CEILING BASE MATERIAL CONNECTION STRUCTURE
Europäisches Patentamt | 2019
|MOUNTING BRACE AS WELL AS CEILING BASE STRUCTURE USING THE SAME AND CEILING BASE CONSTRUCTION METHOD
Europäisches Patentamt | 2017
|