Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR CONSTRUCTING PILE AND PILE
PROBLEM TO BE SOLVED: To make it possible to easily construct a prestressed pile at a construction site where a drilling hole is installed.SOLUTION: Constructing a pile P in a drilling hole 1 by hardening a hardening filler 13 packed in the drilling hole 1 comprises the steps of: inserting a cylindrical fabric 10 with closed tips into the drilling hole 1 from the closed tip; packing the hardening filler 13 in the cylindrical fabric 10; hardening the filler 13 packed in the cylindrical fabric 10 in a state that tension is applied to the cylindrical fabric 10 upward as the cylindrical fabric 10 is held in the drilling hole 1; and releasing the tension applied to the cylindrical fabric 10 and forming the pile P in the drilling hole 1.SELECTED DRAWING: Figure 5
【課題】 掘削孔が設けられた施工現場において、プレストレスト杭を簡単に施工できるようにする。【解決手段】 掘削孔1内に充填させた硬化性の充填材13を硬化させて、掘削孔1内に杭Pを施工するにあたり、先端部が閉じられた筒状織物10を、閉じられた先端部から掘削孔1内に挿入する工程と、前記の筒状織物10内に硬化性の充填材13を充填する工程と、前記の筒状織物10を掘削孔1内に保持させるようにして、筒状織物10に上方に向けて張力を作用させた状態で、筒状織物10内に充填させた充填材13を硬化させる工程と、前記の筒状織物10に作用させた張力を解除させて、掘削孔1内に杭Pを形成する工程と、を行う。【選択図】 図5
METHOD FOR CONSTRUCTING PILE AND PILE
PROBLEM TO BE SOLVED: To make it possible to easily construct a prestressed pile at a construction site where a drilling hole is installed.SOLUTION: Constructing a pile P in a drilling hole 1 by hardening a hardening filler 13 packed in the drilling hole 1 comprises the steps of: inserting a cylindrical fabric 10 with closed tips into the drilling hole 1 from the closed tip; packing the hardening filler 13 in the cylindrical fabric 10; hardening the filler 13 packed in the cylindrical fabric 10 in a state that tension is applied to the cylindrical fabric 10 upward as the cylindrical fabric 10 is held in the drilling hole 1; and releasing the tension applied to the cylindrical fabric 10 and forming the pile P in the drilling hole 1.SELECTED DRAWING: Figure 5
【課題】 掘削孔が設けられた施工現場において、プレストレスト杭を簡単に施工できるようにする。【解決手段】 掘削孔1内に充填させた硬化性の充填材13を硬化させて、掘削孔1内に杭Pを施工するにあたり、先端部が閉じられた筒状織物10を、閉じられた先端部から掘削孔1内に挿入する工程と、前記の筒状織物10内に硬化性の充填材13を充填する工程と、前記の筒状織物10を掘削孔1内に保持させるようにして、筒状織物10に上方に向けて張力を作用させた状態で、筒状織物10内に充填させた充填材13を硬化させる工程と、前記の筒状織物10に作用させた張力を解除させて、掘削孔1内に杭Pを形成する工程と、を行う。【選択図】 図5
METHOD FOR CONSTRUCTING PILE AND PILE
杭の施工方法及び杭
SEKINE SHINJI (Autor:in) / HIRAKO KENSHIRO (Autor:in)
24.08.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|PILE FOUNDATION AND METHOD FOR CONSTRUCTING PILE FOUNDATION
Europäisches Patentamt | 2020
|METHOD FOR CONSTRUCTING PILE FOUNDATION AND PILE FOUNDATION
Europäisches Patentamt | 2017
|