PROBLEM TO BE SOLVED: To provide an installation method of a double floor of improved workability.SOLUTION: An installation method of a double floor includes: a supporting leg installation step in which a supporting leg 2 is installed on a floor slab 1; a floor material installation step in which a floor material 3 is supported on the supporting leg 2; and a wall material installation step in which a wall material 5 is installed at any location on the floor material 3. In the supporting leg installation step, the supporting legs 2 are installed on the floor slab 1 in two directions that are orthogonal to each other, at almost equal prescribed intervals. In the supporting leg installation step, a starting point 2A is set at any location on the floor slab 1, and the supporting legs 2 are installed in the two directions leaving the prescribed interval respectively from the starting point 2A.SELECTED DRAWING: Figure 1
【課題】施工性を向上させた二重床の施工方法を提供する。【解決手段】二重床の施工方法は、床スラブ1上に、支持脚2を設置する支持脚設置工程と、支持脚2に床材3を支持させる床材設置工程と、床材3上の任意の位置に、壁材5を設置する壁材設置工程と、を備え、支持脚設置工程では、床スラブ1に沿い互いに直交する二方向において、略同一の所定間隔をあけて支持脚2を設置し、支持脚設置工程では、床スラブ1上の任意の位置を起点2Aとして、起点2Aから二方向にそれぞれ所定間隔をあけて支持脚2を設置することを特徴とする。【選択図】図1
PROBLEM TO BE SOLVED: To provide an installation method of a double floor of improved workability.SOLUTION: An installation method of a double floor includes: a supporting leg installation step in which a supporting leg 2 is installed on a floor slab 1; a floor material installation step in which a floor material 3 is supported on the supporting leg 2; and a wall material installation step in which a wall material 5 is installed at any location on the floor material 3. In the supporting leg installation step, the supporting legs 2 are installed on the floor slab 1 in two directions that are orthogonal to each other, at almost equal prescribed intervals. In the supporting leg installation step, a starting point 2A is set at any location on the floor slab 1, and the supporting legs 2 are installed in the two directions leaving the prescribed interval respectively from the starting point 2A.SELECTED DRAWING: Figure 1
【課題】施工性を向上させた二重床の施工方法を提供する。【解決手段】二重床の施工方法は、床スラブ1上に、支持脚2を設置する支持脚設置工程と、支持脚2に床材3を支持させる床材設置工程と、床材3上の任意の位置に、壁材5を設置する壁材設置工程と、を備え、支持脚設置工程では、床スラブ1に沿い互いに直交する二方向において、略同一の所定間隔をあけて支持脚2を設置し、支持脚設置工程では、床スラブ1上の任意の位置を起点2Aとして、起点2Aから二方向にそれぞれ所定間隔をあけて支持脚2を設置することを特徴とする。【選択図】図1
INSTALLATION METHOD OF DOUBLE FLOOR
二重床の施工方法
TSUNODA SAYO (Autor:in)
14.09.2017
Patent
Elektronische Ressource
Japanisch
DOUBLE FLOOR STRUCTURE AND DOUBLE FLOOR INSTALLATION METHOD
Europäisches Patentamt | 2017
|FLOOR INSTALLATION MECHANISM, FLOOR INSTALLATION DEVICE AND FLOOR INSTALLATION METHOD
Europäisches Patentamt | 2022
|Supporting Assembly for Installation of Double Floor and Its Installation Method
Europäisches Patentamt | 2017
|FLOOR SLAB INSTALLATION DEVICE AND FLOOR SLAB INSTALLATION METHOD
Europäisches Patentamt | 2024
|FLOOR SLAB INSTALLATION DEVICE AND FLOOR SLAB INSTALLATION METHOD
Europäisches Patentamt | 2019
|