GRIPPING DEVICE OF VIBRATION HAMMER, AND STEEL SHEET PILE INSTALLATION METHOD
PROBLEM TO BE SOLVED: To provide a gripping device of a vibration hammer that grips a steel sheet pile having unspecified flange height and pitch.SOLUTION: A gripping device 10 of a vibration hammer includes two chucks 1A, 1B disposed apart from each other, an adaptor 3 positioned above the chuck, and fixing means for fixing the chuck on a bottom plate 32 of the adaptor. The fixing means includes a slide base 21 having a rail groove 24, a plurality of bolts 22 inserted into the rail groove 24 and protruding upward, a plurality of holes 35 drilled through the bottom plate 32, and a plurality of nuts 23. The plurality of holes 35 are pierced through the bottom plate 32 of the adaptor 3, and the plurality of holes 35 are arranged in a greater number than the plurality of bolts 22 on a row in a flange height direction. Webs at two locations on steel sheet piles having different flange heights H may be gripped, by changing a fixed position of the chuck to the adaptor in the flange height direction.SELECTED DRAWING: Figure 1
【課題】バイブロハンマの把持装置がフランジ高さとピッチ幅が不特定である鋼矢板を把持する。【解決手段】バイブロハンマの把持装置10が、離間して配置された2つのチャック1A,1Bと、チャックの上方に位置するアダプタ3と、チャックをアダプタの底板32に固定する固定手段とを備え、固定手段は、レール溝24を具備するスライドベース21と、レール溝24に挿入されかつ上方に突出する複数のボルト22と、底板32に穿設された複数の孔35と、複数のナット23と、を具備し、アダプタ3の底板32に穿設された複数の孔35は、フランジ高さ方向に沿った1つの列に複数のボルト22より多い数の孔35が配置されており、フランジ高さ方向において、チャックのアダプタに対する固定位置を変更することにより、フランジ高さHの異なる鋼矢板の2箇所のウェブを把持可能である。【選択図】図1
GRIPPING DEVICE OF VIBRATION HAMMER, AND STEEL SHEET PILE INSTALLATION METHOD
PROBLEM TO BE SOLVED: To provide a gripping device of a vibration hammer that grips a steel sheet pile having unspecified flange height and pitch.SOLUTION: A gripping device 10 of a vibration hammer includes two chucks 1A, 1B disposed apart from each other, an adaptor 3 positioned above the chuck, and fixing means for fixing the chuck on a bottom plate 32 of the adaptor. The fixing means includes a slide base 21 having a rail groove 24, a plurality of bolts 22 inserted into the rail groove 24 and protruding upward, a plurality of holes 35 drilled through the bottom plate 32, and a plurality of nuts 23. The plurality of holes 35 are pierced through the bottom plate 32 of the adaptor 3, and the plurality of holes 35 are arranged in a greater number than the plurality of bolts 22 on a row in a flange height direction. Webs at two locations on steel sheet piles having different flange heights H may be gripped, by changing a fixed position of the chuck to the adaptor in the flange height direction.SELECTED DRAWING: Figure 1
【課題】バイブロハンマの把持装置がフランジ高さとピッチ幅が不特定である鋼矢板を把持する。【解決手段】バイブロハンマの把持装置10が、離間して配置された2つのチャック1A,1Bと、チャックの上方に位置するアダプタ3と、チャックをアダプタの底板32に固定する固定手段とを備え、固定手段は、レール溝24を具備するスライドベース21と、レール溝24に挿入されかつ上方に突出する複数のボルト22と、底板32に穿設された複数の孔35と、複数のナット23と、を具備し、アダプタ3の底板32に穿設された複数の孔35は、フランジ高さ方向に沿った1つの列に複数のボルト22より多い数の孔35が配置されており、フランジ高さ方向において、チャックのアダプタに対する固定位置を変更することにより、フランジ高さHの異なる鋼矢板の2箇所のウェブを把持可能である。【選択図】図1
GRIPPING DEVICE OF VIBRATION HAMMER, AND STEEL SHEET PILE INSTALLATION METHOD
バイブロハンマの把持装置及び鋼矢板施工方法
NAKASHIRO NOBUHIRO (Autor:in) / YOKOYAMA HIROYASU (Autor:in) / MIZOTSUGU KEI (Autor:in) / KATO TSUTOMU (Autor:in) / SUZUKI YUKICHI (Autor:in)
05.10.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
Europäisches Patentamt | 2017
|HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
Europäisches Patentamt | 2017
|SHEET PILE INSTALLATION VIBRATION STUDY
British Library Conference Proceedings | 1995
|Steel sheet pile construction method suitable for gun hammer
Europäisches Patentamt | 2024
|STEEL PIPE SHEET PILE AND INSTALLATION METHOD OF STEEL PIPE SHEET PILE
Europäisches Patentamt | 2020
|