Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD OF PILE DRIVER
PROBLEM TO BE SOLVED: To provide a construction method of a pile driver capable of storing pile positional information and construction actual data, by surely reading in plan data stringed to a pile number of existing in a construction position, by preventing a human error such as erroneous input.SOLUTION: In a construction method of a pile driver for burying a plurality of piles in a plurality of construction positions by the pile driver 1 having a construction management device 10, the construction management device 10 comprises storage means for storing preplanned plan data of including a pile number and construction data on the burying depth, display means for displaying pile positional information based on the plan data and a GPS receiver for acquiring positional information of the pile driver, and on construction on and after a third pile, the positional information is calculated by an offset quantity from first and second construction positions, and is displayed on the display means, to be buried after selecting the pile number of the displayed plan data, and construction actual data is stored together with pile number information.SELECTED DRAWING: Figure 1
【課題】誤入力のようなヒューマンエラーを防ぎ、施工位置にあった杭番号に紐づいた計画データを確実に読み込むことができるとともに、杭位置情報、施工実績データを記憶できる杭打機の施工方法を提供する。【解決手段】施工管理装置10を備えた杭打機1によって複数の施工位置に複数の杭を埋設する杭打機の施工方法において、施工管理装置10は、杭番号と埋設深度の施工データを含むあらかじめ計画された計画データを記憶する記憶手段と、計画データに基づく杭位置情報を表示する表示手段と、杭打機の位置情報を取得するGPS受信装置とを備え、第3の杭以降の施工については、位置情報を第1及び第2の施工位置からのオフセット量で算出して表示手段に表示し、表示された計画データの杭番号を選択した上で埋設し、施工実績データを杭番号情報とともに記憶する。【選択図】図1
CONSTRUCTION METHOD OF PILE DRIVER
PROBLEM TO BE SOLVED: To provide a construction method of a pile driver capable of storing pile positional information and construction actual data, by surely reading in plan data stringed to a pile number of existing in a construction position, by preventing a human error such as erroneous input.SOLUTION: In a construction method of a pile driver for burying a plurality of piles in a plurality of construction positions by the pile driver 1 having a construction management device 10, the construction management device 10 comprises storage means for storing preplanned plan data of including a pile number and construction data on the burying depth, display means for displaying pile positional information based on the plan data and a GPS receiver for acquiring positional information of the pile driver, and on construction on and after a third pile, the positional information is calculated by an offset quantity from first and second construction positions, and is displayed on the display means, to be buried after selecting the pile number of the displayed plan data, and construction actual data is stored together with pile number information.SELECTED DRAWING: Figure 1
【課題】誤入力のようなヒューマンエラーを防ぎ、施工位置にあった杭番号に紐づいた計画データを確実に読み込むことができるとともに、杭位置情報、施工実績データを記憶できる杭打機の施工方法を提供する。【解決手段】施工管理装置10を備えた杭打機1によって複数の施工位置に複数の杭を埋設する杭打機の施工方法において、施工管理装置10は、杭番号と埋設深度の施工データを含むあらかじめ計画された計画データを記憶する記憶手段と、計画データに基づく杭位置情報を表示する表示手段と、杭打機の位置情報を取得するGPS受信装置とを備え、第3の杭以降の施工については、位置情報を第1及び第2の施工位置からのオフセット量で算出して表示手段に表示し、表示された計画データの杭番号を選択した上で埋設し、施工実績データを杭番号情報とともに記憶する。【選択図】図1
CONSTRUCTION METHOD OF PILE DRIVER
杭打機の施工方法
KIRIYAMA MASAMI (Autor:in)
19.10.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen