SOIL IMPROVEMENT MATERIAL TEMPORARY PLACING DEVICE AND SOIL IMPROVEMENT MATERIAL TEMPORARY PLACING METHOD
PROBLEM TO BE SOLVED: To efficiently implement a work to temporarily place a soil improvement material on the ground.SOLUTION: A soil improvement material temporary placing device 1 is a device for temporarily placing a soil improvement material in powder and granular material state on the ground. The soil improvement material temporary placing device 1 has a cylindrical member 2 with an underside opening, which has a soil improvement material inflow port 26 on an upper side and extends in a vertical direction, and a box-shaped member 3 with an underside opening, which is installed on the cylindrical member 2 so as to cover at least a lower part of the cylindrical member 2 from outside. An undersurface 2b of the cylindrical member 2 is located above the undersurface of the box-shaped member 3. The underside opening of the box-shaped member 3 can be blocked with the ground. A horizontal sectional area of an inner space of the box-shaped member 3 is larger than that of an inner space of the cylindrical member 2.SELECTED DRAWING: Figure 12
【課題】地盤改良材の地面上への仮置き作業を効率良く行う。【解決手段】地盤改良材仮置き装置1は、地面上に粉粒体状の地盤改良材を仮置きするための装置である。地盤改良材仮置き装置1は、上部に地盤改良材流入口26を有して上下方向に延在する、下面開口の筒状部材2と、筒状部材2の少なくとも下部を外方から覆うように筒状部材2に取り付けられた、下面開口の箱状部材3と、を備える。筒状部材2の下面2bが箱状部材3の下面よりも上方に位置している。箱状部材3の下面開口は地面によって閉塞可能である。箱状部材3の内部空間の水平断面積が、筒状部材2の内部空間の水平断面積よりも大きい。【選択図】図12
SOIL IMPROVEMENT MATERIAL TEMPORARY PLACING DEVICE AND SOIL IMPROVEMENT MATERIAL TEMPORARY PLACING METHOD
PROBLEM TO BE SOLVED: To efficiently implement a work to temporarily place a soil improvement material on the ground.SOLUTION: A soil improvement material temporary placing device 1 is a device for temporarily placing a soil improvement material in powder and granular material state on the ground. The soil improvement material temporary placing device 1 has a cylindrical member 2 with an underside opening, which has a soil improvement material inflow port 26 on an upper side and extends in a vertical direction, and a box-shaped member 3 with an underside opening, which is installed on the cylindrical member 2 so as to cover at least a lower part of the cylindrical member 2 from outside. An undersurface 2b of the cylindrical member 2 is located above the undersurface of the box-shaped member 3. The underside opening of the box-shaped member 3 can be blocked with the ground. A horizontal sectional area of an inner space of the box-shaped member 3 is larger than that of an inner space of the cylindrical member 2.SELECTED DRAWING: Figure 12
【課題】地盤改良材の地面上への仮置き作業を効率良く行う。【解決手段】地盤改良材仮置き装置1は、地面上に粉粒体状の地盤改良材を仮置きするための装置である。地盤改良材仮置き装置1は、上部に地盤改良材流入口26を有して上下方向に延在する、下面開口の筒状部材2と、筒状部材2の少なくとも下部を外方から覆うように筒状部材2に取り付けられた、下面開口の箱状部材3と、を備える。筒状部材2の下面2bが箱状部材3の下面よりも上方に位置している。箱状部材3の下面開口は地面によって閉塞可能である。箱状部材3の内部空間の水平断面積が、筒状部材2の内部空間の水平断面積よりも大きい。【選択図】図12
SOIL IMPROVEMENT MATERIAL TEMPORARY PLACING DEVICE AND SOIL IMPROVEMENT MATERIAL TEMPORARY PLACING METHOD
地盤改良材仮置き装置、及び地盤改良材の仮置き方法
MAEDA MAKOTO (Autor:in) / FUJITA KAZUHIRO (Autor:in) / MINEGISHI MASAYUKI (Autor:in) / INOUE HIROYUKI (Autor:in) / KAWAZU KOJI (Autor:in) / ASAGIRI HIDEHITO (Autor:in)
26.10.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,