Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
JOINING STRUCTURE OF PHC PILE AND STEEL COLUMN
PROBLEM TO BE SOLVED: To provide a joining structure of a PHC pile and a steel column for suitably joining the PHC pile and the steel column.SOLUTION: A joining structure of a PHC pile and a steel column comprises: a steel plate 7 which is integrally attached so as to cover a pile head part of a PHC pile 2; a cylindrical ring socket 4 in which the pile head part of the PHC pile 2 and a lower end part of the steel column 3 arranged on the pile head part are arranged, and which internally wraps them; a ring socket side bearing material 11 which is protrusively arranged inside from an inner face of the ring socket 4; a PHC pile outside bearing material 12 which is protrusively arranged outside from an outer face of the steel plate 7; a steel column side bearing material 14 which is protrusively arranged outside from an outer face of the lower end part of the steel column 3; and joining-part charge concrete 6 which is charged between and among the ring socket 4, the pile head part of the PHC pile 2 and the lower end part of the steel column 3.SELECTED DRAWING: Figure 3
【課題】PHC杭と鉄骨柱を好適に接合するためのPHC杭と鉄骨柱の接合構造を提供する。【解決手段】PHC杭2の杭頭部を被覆するように一体に取り付けられた鋼製プレート7と、PHC杭2の杭頭部及び杭頭部の上に配設される鉄骨柱3の下端部を内部に配して内包するように設けられる筒状のリングソケット4と、リングソケット4の内面から内側に突設されたリングソケット側支圧材11と、鋼製プレート7の外面から外側に突設されたPHC杭外側支圧材12と、鉄骨柱3の下端部の外面から外側に突設された鉄骨柱側支圧材14と、リングソケット4とPHC杭2の杭頭部、鉄骨柱3の下端部との間に充填される接合部充填コンクリート6とを備えて構成する。【選択図】図3
JOINING STRUCTURE OF PHC PILE AND STEEL COLUMN
PROBLEM TO BE SOLVED: To provide a joining structure of a PHC pile and a steel column for suitably joining the PHC pile and the steel column.SOLUTION: A joining structure of a PHC pile and a steel column comprises: a steel plate 7 which is integrally attached so as to cover a pile head part of a PHC pile 2; a cylindrical ring socket 4 in which the pile head part of the PHC pile 2 and a lower end part of the steel column 3 arranged on the pile head part are arranged, and which internally wraps them; a ring socket side bearing material 11 which is protrusively arranged inside from an inner face of the ring socket 4; a PHC pile outside bearing material 12 which is protrusively arranged outside from an outer face of the steel plate 7; a steel column side bearing material 14 which is protrusively arranged outside from an outer face of the lower end part of the steel column 3; and joining-part charge concrete 6 which is charged between and among the ring socket 4, the pile head part of the PHC pile 2 and the lower end part of the steel column 3.SELECTED DRAWING: Figure 3
【課題】PHC杭と鉄骨柱を好適に接合するためのPHC杭と鉄骨柱の接合構造を提供する。【解決手段】PHC杭2の杭頭部を被覆するように一体に取り付けられた鋼製プレート7と、PHC杭2の杭頭部及び杭頭部の上に配設される鉄骨柱3の下端部を内部に配して内包するように設けられる筒状のリングソケット4と、リングソケット4の内面から内側に突設されたリングソケット側支圧材11と、鋼製プレート7の外面から外側に突設されたPHC杭外側支圧材12と、鉄骨柱3の下端部の外面から外側に突設された鉄骨柱側支圧材14と、リングソケット4とPHC杭2の杭頭部、鉄骨柱3の下端部との間に充填される接合部充填コンクリート6とを備えて構成する。【選択図】図3
JOINING STRUCTURE OF PHC PILE AND STEEL COLUMN
PHC杭と鉄骨柱の接合構造
TATSUMI YOSHIHIRO (Autor:in) / ISHII DAIGO (Autor:in) / TAMURA JUNICHI (Autor:in) / OIZUMI CHIAKI (Autor:in)
02.11.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
JOINING STRUCTURE OF STEEL PIPE PILE AND STEEL COLUMN
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|