Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SNOW STOPPING AND MELTING TOOL ON FOLDED ROOF
PROBLEM TO BE SOLVED: To provide a snow stopping and melting tool on a folded roof capable of enhancing snow melting effect and snow sliding down prevention effect.SOLUTION: The snow stopping and melting tool includes: a folded roofing material; a pair of fixation members 1, 1 which is disposed on right and left tops b, b of trough a of folded roofing material; a horizontal rod 3 the edge parts 3' and 3' of which are engaged with the pair of fixation members 1, 1; a snow-stop member 4 which is attached to the horizontal rod being inclined from the bottom part 6 upward on the trough; and a pair of stop tubes 7, 7 disposed at the bottom part of hanger support rods 5 which are provided to the peripheral side parts. The snow-stop member has a latticework configuration.SELECTED DRAWING: Figure 1
【課題】 本発明は、折版屋根における軒先部における雪庇の滑落防止と融雪効果を高めることを目的とする。【解決手段】 折版屋根材の谷部aの左右両側頂部b,bに設置した定置材1,1に横杆3の各端部3’,3’を嵌装し、この横杆には前記谷部に対し底辺部6が前記谷部の上方向に傾斜位置するように成る雪止め部材4の周側部に設けた吊支杆5の底辺部に停止管7,7を設けて成るもので、前記雪止め部材の構成は格子状に成るものである。【選択図】 図1
SNOW STOPPING AND MELTING TOOL ON FOLDED ROOF
PROBLEM TO BE SOLVED: To provide a snow stopping and melting tool on a folded roof capable of enhancing snow melting effect and snow sliding down prevention effect.SOLUTION: The snow stopping and melting tool includes: a folded roofing material; a pair of fixation members 1, 1 which is disposed on right and left tops b, b of trough a of folded roofing material; a horizontal rod 3 the edge parts 3' and 3' of which are engaged with the pair of fixation members 1, 1; a snow-stop member 4 which is attached to the horizontal rod being inclined from the bottom part 6 upward on the trough; and a pair of stop tubes 7, 7 disposed at the bottom part of hanger support rods 5 which are provided to the peripheral side parts. The snow-stop member has a latticework configuration.SELECTED DRAWING: Figure 1
【課題】 本発明は、折版屋根における軒先部における雪庇の滑落防止と融雪効果を高めることを目的とする。【解決手段】 折版屋根材の谷部aの左右両側頂部b,bに設置した定置材1,1に横杆3の各端部3’,3’を嵌装し、この横杆には前記谷部に対し底辺部6が前記谷部の上方向に傾斜位置するように成る雪止め部材4の周側部に設けた吊支杆5の底辺部に停止管7,7を設けて成るもので、前記雪止め部材の構成は格子状に成るものである。【選択図】 図1
SNOW STOPPING AND MELTING TOOL ON FOLDED ROOF
折版屋根における雪止め兼融雪具
HARADA SHIMPEI (Autor:in)
07.12.2017
Patent
Elektronische Ressource
Japanisch
EAVES SNOW MELTING METAL FITTING FOR FOLDED-PLATE ROOF
Europäisches Patentamt | 2015
|