FLOOR SLAB MOVEMENT MACHINE AND FLOOR SLAB MOVEMENT METHOD
PROBLEM TO BE SOLVED: To shorten a work time.SOLUTION: The direction for moving a first floor slab suspension movement part 10a-the (n)th floor slab suspension movement part 10n is regulated so that the first floor slab suspension movement part 10a-the (n)th floor slab suspension movement part 10n of any state of a state of suspending a floor slab 50a and a state of not suspending the floor slab 50a, move while circulating by mutually opening an interval by circulation orbits 20a and 20b of a floor slab movement machine 1. Thus, while moving to a floor slab preparation place 101 of preparing floor slabs 50c-50g for newly installing the first floor slab suspension movement part 10a of becoming a state of not suspending the floor slab 50b by finishing an installation of the floor slab 50b in a floor slab installation place 102 for installing the floor slab 50a, the second floor slab suspension movement part 10b of already suspending the other floor slab 50c in the floor slab preparation place 101 of preparing the installing floor slabs 50c-50g, can move the other floor slab 50c to the floor slab installation place 102. Thus, a work time can be shortened.SELECTED DRAWING: Figure 1
【課題】作業時間を短縮する。【解決手段】床版移動機1の循環軌道20a,20bにより、床版50a等を吊り上げた状態及び床版50a等を吊り上げていない状態のいずれかの状態の第1床版吊上移動部10a〜第n床版吊上移動部10nが互いに間隔を空けて循環しつつ移動するように、第1床版吊上移動部10a〜第n床版吊上移動部10nが移動する方向が規定される。このため、床版50a等が設置される床版設置場所102での床版50bの設置が終了し、床版50bを吊り上げていない状態となった第1床版吊上移動部10aが新たに設置される床版50c〜50gが準備されている床版準備場所101に移動している間に、設置される床版50c〜50gが準備されている床版準備場所101で既に他の床版50cを吊り上げた第2床版吊上移動部10bが他の床版50cを床版設置場所102へと移動させることができる。よって、作業時間を短縮することができる。【選択図】図1
FLOOR SLAB MOVEMENT MACHINE AND FLOOR SLAB MOVEMENT METHOD
PROBLEM TO BE SOLVED: To shorten a work time.SOLUTION: The direction for moving a first floor slab suspension movement part 10a-the (n)th floor slab suspension movement part 10n is regulated so that the first floor slab suspension movement part 10a-the (n)th floor slab suspension movement part 10n of any state of a state of suspending a floor slab 50a and a state of not suspending the floor slab 50a, move while circulating by mutually opening an interval by circulation orbits 20a and 20b of a floor slab movement machine 1. Thus, while moving to a floor slab preparation place 101 of preparing floor slabs 50c-50g for newly installing the first floor slab suspension movement part 10a of becoming a state of not suspending the floor slab 50b by finishing an installation of the floor slab 50b in a floor slab installation place 102 for installing the floor slab 50a, the second floor slab suspension movement part 10b of already suspending the other floor slab 50c in the floor slab preparation place 101 of preparing the installing floor slabs 50c-50g, can move the other floor slab 50c to the floor slab installation place 102. Thus, a work time can be shortened.SELECTED DRAWING: Figure 1
【課題】作業時間を短縮する。【解決手段】床版移動機1の循環軌道20a,20bにより、床版50a等を吊り上げた状態及び床版50a等を吊り上げていない状態のいずれかの状態の第1床版吊上移動部10a〜第n床版吊上移動部10nが互いに間隔を空けて循環しつつ移動するように、第1床版吊上移動部10a〜第n床版吊上移動部10nが移動する方向が規定される。このため、床版50a等が設置される床版設置場所102での床版50bの設置が終了し、床版50bを吊り上げていない状態となった第1床版吊上移動部10aが新たに設置される床版50c〜50gが準備されている床版準備場所101に移動している間に、設置される床版50c〜50gが準備されている床版準備場所101で既に他の床版50cを吊り上げた第2床版吊上移動部10bが他の床版50cを床版設置場所102へと移動させることができる。よって、作業時間を短縮することができる。【選択図】図1
FLOOR SLAB MOVEMENT MACHINE AND FLOOR SLAB MOVEMENT METHOD
床版移動機及び床版移動方法
UEDA AKIRO (Autor:in) / OHASHI MASAAKI (Autor:in) / YAMAUCHI TAKEKI (Autor:in) / NISHIO AKIRA (Autor:in)
21.12.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Floor slab prestress influence eliminating floor slab
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|FLOOR SLAB STRUCTURE AND FLOOR SLAB REPLACEMENT METHOD
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|