Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To provide a guard fence for a bridge, which secures a clearance limit specified by the Government Order on Road Design Standards, through the use of an existing wheel guard, even in the case of the narrow wheel guard.SOLUTION: A guard fence for a bridge includes: a base member 2 that is loaded on a top surface of a wheel guard of the bridge for a road and that has a plurality of anchor bolt mounting holes 21; a column part 3 that is positioned above the base member 2; and a holding member 4 that is fixed to the base member 2 and at least partially extended upward with respect to the anchor bolt mounting hole 21 and in a backward direction opposite to a road direction, that is, the holding member 4 having a column part holding part 43 for holding the column part 3. The column part holding part 43 holds at least a front part and a lateral part of the column part 3.SELECTED DRAWING: Figure 5
【課題】幅の狭い地覆であっても、既設の地覆を利用して、道路構造令において定められた建築限界を確保した橋梁用防護柵を提供する。【解決手段】道路用橋梁における地覆上面に載置され、複数のアンカーボルト取付孔21を有するベース部材2と、前記ベース部材2よりも上方に位置する柱部3と、前記ベース部材2に固定され、少なくとも一部が前記アンカーボルト取付孔21よりも上方かつ道路と反対の方向である後方に延びる保持部材4であって、前記柱部3を保持する柱部保持部43を有する保持部材4と、を備え、前記柱部保持部43は、前記柱部3の少なくとも前方部分と側方部分とを保持する。【選択図】図5
PROBLEM TO BE SOLVED: To provide a guard fence for a bridge, which secures a clearance limit specified by the Government Order on Road Design Standards, through the use of an existing wheel guard, even in the case of the narrow wheel guard.SOLUTION: A guard fence for a bridge includes: a base member 2 that is loaded on a top surface of a wheel guard of the bridge for a road and that has a plurality of anchor bolt mounting holes 21; a column part 3 that is positioned above the base member 2; and a holding member 4 that is fixed to the base member 2 and at least partially extended upward with respect to the anchor bolt mounting hole 21 and in a backward direction opposite to a road direction, that is, the holding member 4 having a column part holding part 43 for holding the column part 3. The column part holding part 43 holds at least a front part and a lateral part of the column part 3.SELECTED DRAWING: Figure 5
【課題】幅の狭い地覆であっても、既設の地覆を利用して、道路構造令において定められた建築限界を確保した橋梁用防護柵を提供する。【解決手段】道路用橋梁における地覆上面に載置され、複数のアンカーボルト取付孔21を有するベース部材2と、前記ベース部材2よりも上方に位置する柱部3と、前記ベース部材2に固定され、少なくとも一部が前記アンカーボルト取付孔21よりも上方かつ道路と反対の方向である後方に延びる保持部材4であって、前記柱部3を保持する柱部保持部43を有する保持部材4と、を備え、前記柱部保持部43は、前記柱部3の少なくとも前方部分と側方部分とを保持する。【選択図】図5
GUARD FENCE FOR BRIDGE
橋梁用防護柵
NAKANO KEISUKE (Autor:in)
08.02.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2016
|