Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION MANAGEMENT SYSTEM, WORKING MACHINE AND CONSTRUCTION MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a construction management system which suppresses the elongation of a construction period, and can perform high-accuracy construction.SOLUTION: A construction management system comprises: a display control part for making a display device display two-dimensional data which are parallel with a reference face regulated at a construction object, and working machine display data indicating at least a part of a working machine which can excavate the construction object; an input excavation depth data acquisition part for acquiring input excavation depth data which are created by an operation of an input device; and a working machine control part for outputting a control signal for controlling the movement of the working machine with respect to a depth direction of the construction object which is orthogonal to the reference face on the basis of input excavation depth data.SELECTED DRAWING: Figure 8
【課題】工期の長期化を抑制し高精度な施工を実施できる施工管理システムを提供する。【解決手段】施工管理システムは、施工対象に規定された基準面と平行な2次元設計データと施工対象を掘削可能な作業機の少なくとも一部を示す作業機表示データとを表示装置に表示させる表示制御部と、入力装置が操作されることにより生成された入力掘削深さデータを取得する入力掘削深さデータ取得部と、入力掘削深さデータに基づいて、基準面と直交する施工対象の深さ方向についての作業機の移動を制御する制御信号を出力する作業機制御部と、を備える。【選択図】図8
CONSTRUCTION MANAGEMENT SYSTEM, WORKING MACHINE AND CONSTRUCTION MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a construction management system which suppresses the elongation of a construction period, and can perform high-accuracy construction.SOLUTION: A construction management system comprises: a display control part for making a display device display two-dimensional data which are parallel with a reference face regulated at a construction object, and working machine display data indicating at least a part of a working machine which can excavate the construction object; an input excavation depth data acquisition part for acquiring input excavation depth data which are created by an operation of an input device; and a working machine control part for outputting a control signal for controlling the movement of the working machine with respect to a depth direction of the construction object which is orthogonal to the reference face on the basis of input excavation depth data.SELECTED DRAWING: Figure 8
【課題】工期の長期化を抑制し高精度な施工を実施できる施工管理システムを提供する。【解決手段】施工管理システムは、施工対象に規定された基準面と平行な2次元設計データと施工対象を掘削可能な作業機の少なくとも一部を示す作業機表示データとを表示装置に表示させる表示制御部と、入力装置が操作されることにより生成された入力掘削深さデータを取得する入力掘削深さデータ取得部と、入力掘削深さデータに基づいて、基準面と直交する施工対象の深さ方向についての作業機の移動を制御する制御信号を出力する作業機制御部と、を備える。【選択図】図8
CONSTRUCTION MANAGEMENT SYSTEM, WORKING MACHINE AND CONSTRUCTION MANAGEMENT METHOD
施工管理システム、作業機械、及び施工管理方法
ONODERA AKINORI (Autor:in) / NAKAMURA KENJI (Autor:in) / BABA KOSUKE (Autor:in)
08.02.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02F
Baggern
,
DREDGING