Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
REINFORCED CONCRETE STRUCTURE AND DESIGN METHOD OF COLUMN-BEAM JUNCTION
PROBLEM TO BE SOLVED: To provide a reinforced concrete structure and a design method of a column-beam junction that offer sufficient bearing capacity and deformability while maintaining construction efficiency.SOLUTION: A reinforced concrete structure of a column-beam junction 15 has an edge part of a beam 20 connected to a column 30 made of reinforced concrete. The beam 20 is a reinforced concrete beam, formed by concrete 25 with a main reinforcing bar 21, an additional reinforcing bar 22 and others embedded therein. The main reinforcing bar 21 is a through-arranged reinforcing bar embedded over an entire length of the beam 20, while the additional reinforcing bar 22 is a reinforcing bar embedded in the beam 20 with a tip located midway along the beam 20. The additional reinforcing bar 22 has a length athat equals to or is greater than a half (D/2) of a height D of the beam 20 and shorter than a conventional anchorage length of a cut-off reinforcing bar.SELECTED DRAWING: Figure 1
【課題】施工性を維持しながら、十分な耐力と変形性能を実現することができる柱梁接合部の鉄筋コンクリート構造及び柱梁接合部の設計方法を提供する。【解決手段】柱梁接合部15の鉄筋コンクリート構造においては、梁20の端部が、鉄筋コンクリートで構成される柱30に接合されている。梁20は、鉄筋コンクリート梁であって、主筋21、補強筋22等を埋設したコンクリート25によって構成されている。主筋21は、梁20の全長に渡って埋設されていた通し筋であって、補強筋22は、先端が梁20の途中に位置して梁20に埋設された補強筋である。この補強筋22は、柱との接合端部から、梁20の梁せいDの半分(D/2)以上であって、従来のカットオフ筋の定着長より短い長さarを有している。【選択図】図1
REINFORCED CONCRETE STRUCTURE AND DESIGN METHOD OF COLUMN-BEAM JUNCTION
PROBLEM TO BE SOLVED: To provide a reinforced concrete structure and a design method of a column-beam junction that offer sufficient bearing capacity and deformability while maintaining construction efficiency.SOLUTION: A reinforced concrete structure of a column-beam junction 15 has an edge part of a beam 20 connected to a column 30 made of reinforced concrete. The beam 20 is a reinforced concrete beam, formed by concrete 25 with a main reinforcing bar 21, an additional reinforcing bar 22 and others embedded therein. The main reinforcing bar 21 is a through-arranged reinforcing bar embedded over an entire length of the beam 20, while the additional reinforcing bar 22 is a reinforcing bar embedded in the beam 20 with a tip located midway along the beam 20. The additional reinforcing bar 22 has a length athat equals to or is greater than a half (D/2) of a height D of the beam 20 and shorter than a conventional anchorage length of a cut-off reinforcing bar.SELECTED DRAWING: Figure 1
【課題】施工性を維持しながら、十分な耐力と変形性能を実現することができる柱梁接合部の鉄筋コンクリート構造及び柱梁接合部の設計方法を提供する。【解決手段】柱梁接合部15の鉄筋コンクリート構造においては、梁20の端部が、鉄筋コンクリートで構成される柱30に接合されている。梁20は、鉄筋コンクリート梁であって、主筋21、補強筋22等を埋設したコンクリート25によって構成されている。主筋21は、梁20の全長に渡って埋設されていた通し筋であって、補強筋22は、先端が梁20の途中に位置して梁20に埋設された補強筋である。この補強筋22は、柱との接合端部から、梁20の梁せいDの半分(D/2)以上であって、従来のカットオフ筋の定着長より短い長さarを有している。【選択図】図1
REINFORCED CONCRETE STRUCTURE AND DESIGN METHOD OF COLUMN-BEAM JUNCTION
柱梁接合部の鉄筋コンクリート構造及び柱梁接合部の設計方法
YONEZAWA KENJI (Autor:in)
22.03.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
JUNCTION STRUCTURE AND JUNCTION METHOD BETWEEN REINFORCED CONCRETE COLUMN AND BEAM
Europäisches Patentamt | 2017
|CONSTRUCTION METHOD OF JUNCTION STRUCTURE OF REINFORCED CONCRETE COLUMN AND STEEL BEAM
Europäisches Patentamt | 2024
|JUNCTION STRUCTURE BETWEEN REINFORCED CONCRETE COLUMN AND BEAM, AND CONSTRUCTION METHOD FOR THE SAME
Europäisches Patentamt | 2018
|