Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CEILING FILM CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To shorten the construction period and reduce the cost by easing laying of the ceiling film along the ceiling foundation material without scaffolding.SOLUTION: A ceiling film construction method for laying flexible band-like ceiling film 8 on a ceiling undercover material 5, in a state where linear bodies 16 are attached to both side portions of the ceiling film 8, the ceiling film 8 wound as the taken-up roll is placed on the floor, and both side portions 8a of the ceiling film 8 fed out from the winding roll are supplied to one end side of a pair of support rails 15 constituting the ceiling substrate 5, and supplied leading end portion of the ceiling film 8 is drawn out to the other end side along both support rails 15 and laid.SELECTED DRAWING: Figure 2
【課題】天井下地材に沿った天井膜の敷設を無足場で容易に行うことができ、工期の短縮とコストの縮減を図る。【解決手段】天井下地材5に、可撓性を有する帯状の天井膜8を敷設する天井膜施工方法であって、天井膜8の両側辺部に線状体16を付設した状態で当該天井膜8を巻き取ってある巻取りロールを床上に設置し、巻取りロールから繰り出された天井膜8の両側辺部8aを、天井下地材5を構成する一対の支持レール15の一端側に供給し、供給された天井膜8の先端部を両支持レール15に沿って他端側に引き出して敷設する。【選択図】図2
CEILING FILM CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To shorten the construction period and reduce the cost by easing laying of the ceiling film along the ceiling foundation material without scaffolding.SOLUTION: A ceiling film construction method for laying flexible band-like ceiling film 8 on a ceiling undercover material 5, in a state where linear bodies 16 are attached to both side portions of the ceiling film 8, the ceiling film 8 wound as the taken-up roll is placed on the floor, and both side portions 8a of the ceiling film 8 fed out from the winding roll are supplied to one end side of a pair of support rails 15 constituting the ceiling substrate 5, and supplied leading end portion of the ceiling film 8 is drawn out to the other end side along both support rails 15 and laid.SELECTED DRAWING: Figure 2
【課題】天井下地材に沿った天井膜の敷設を無足場で容易に行うことができ、工期の短縮とコストの縮減を図る。【解決手段】天井下地材5に、可撓性を有する帯状の天井膜8を敷設する天井膜施工方法であって、天井膜8の両側辺部に線状体16を付設した状態で当該天井膜8を巻き取ってある巻取りロールを床上に設置し、巻取りロールから繰り出された天井膜8の両側辺部8aを、天井下地材5を構成する一対の支持レール15の一端側に供給し、供給された天井膜8の先端部を両支持レール15に沿って他端側に引き出して敷設する。【選択図】図2
CEILING FILM CONSTRUCTION METHOD
天井膜施工方法
AMAGUMO SHINICHI (Autor:in) / YOSHIKAWA ATSUSHI (Autor:in) / YOSHIDA YUKIMASA (Autor:in) / SHIRAISHI HIROSHI (Autor:in) / KODERA NORIHIKO (Autor:in) / KIMATA EIJI (Autor:in)
10.05.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
PTFE film suspended ceiling structure and suspended ceiling structure construction technology
Europäisches Patentamt | 2024
|Ceiling hole prefabricated suspended ceiling construction method
Europäisches Patentamt | 2024
|BONDING METHOD, CEILING STRUCTURE AND CEILING CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|