SLOPE STABILIZATION METHOD
PROBLEM TO BE SOLVED: To provide a means capable of ensuring safety during construction with respect to the slope stabilization method by reverse winding construction using an anchor.SOLUTION: Temporary tension is introduced to an anchor at a stage where an intersection is set on a cut surface by using a pressure receiving plate including at least an intersection formed by a factory and an arm part constructed at the site. After that, cutting work of the latter stage is performed. Construction of the arm part and introduction of the final tension force to the anchor are carried out concurrently after the cutting work of the latter stage described above.SELECTED DRAWING: Figure 5
【課題】アンカーを用いた逆巻き施工による斜面安定化工法において、施工途中の安全性を確保することが可能な手段を提供すること。【解決手段】工場製作する交点部と現場構築する腕部とを少なくとも含む受圧板を用い、交点部を切土面に設置した段階でアンカーに一時緊張力を導入してから、後段の切土作業を行う。腕部の構築とアンカーへの最終緊張力の導入は、前記した後段の切土作業以降に並行して実施する。【選択図】図5
SLOPE STABILIZATION METHOD
PROBLEM TO BE SOLVED: To provide a means capable of ensuring safety during construction with respect to the slope stabilization method by reverse winding construction using an anchor.SOLUTION: Temporary tension is introduced to an anchor at a stage where an intersection is set on a cut surface by using a pressure receiving plate including at least an intersection formed by a factory and an arm part constructed at the site. After that, cutting work of the latter stage is performed. Construction of the arm part and introduction of the final tension force to the anchor are carried out concurrently after the cutting work of the latter stage described above.SELECTED DRAWING: Figure 5
【課題】アンカーを用いた逆巻き施工による斜面安定化工法において、施工途中の安全性を確保することが可能な手段を提供すること。【解決手段】工場製作する交点部と現場構築する腕部とを少なくとも含む受圧板を用い、交点部を切土面に設置した段階でアンカーに一時緊張力を導入してから、後段の切土作業を行う。腕部の構築とアンカーへの最終緊張力の導入は、前記した後段の切土作業以降に並行して実施する。【選択図】図5
SLOPE STABILIZATION METHOD
斜面安定化工法
NAGAOKA SHINGEN (Autor:in) / IWAZU MASAYA (Autor:in)
14.06.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
SLOPE STABILIZATION STRUCTURE AND SLOPE STABILIZATION METHOD