TEMPORARY STRUT AND CONSTRUCTION METHOD OF ROOF FRAME STRUCTURE
PROBLEM TO BE SOLVED: To provide a temporary strut which can be installed under a roof frame structure that is previously provided in a hanging manner, and also speedily disassembled.SOLUTION: A temporary strut 20 temporarily supports a roof frame structure 15. The temporary strut 20 is provided with a lifting reception stand 22 provided movably in an elevating/lowering manner across the top face of a mast 21 of a tower crane, a jack reception beam 25 provided across the upper face of the lifting reception stand 22, and a jack 26 arranged above the jack reception beam 25 to support the roof frame structure 15. According to the present invention, when the temporary strut 20 is to be relocated, the lifting reception stand 22 installed on the top of the mast 21 is lowered to secure a clearance space between the roof frame structure 15 and the top of the mast 21, so that the tip end part of lifting equipment can be inserted into the clearance space to lift up and remove the mast 21.SELECTED DRAWING: Figure 5
【課題】予め架設された屋根架構の下に容易に設置することが可能で、かつ迅速に解体できる仮設支柱を提供すること。【解決手段】仮設支柱20は、屋根架構15を仮支持する。この仮設支柱20は、タワークレーンのマスト21の頂部に設置された昇降可能な昇降受け台22と、昇降受け台22の上面に架設されたジャッキ受け梁25と、ジャッキ受け梁25の上に配置されて屋根架構15を支持するジャッキ26と、を備える。本発明によれば、仮設支柱20を移設する際には、マスト21の頂部に設置された昇降受け台22を下降させ、屋根架構15とマスト21の頂部との間に隙間空間を確保することで、隙間空間に揚重機の先端部を挿入して、マスト21を吊り上げて、撤去することができる。【選択図】図5
TEMPORARY STRUT AND CONSTRUCTION METHOD OF ROOF FRAME STRUCTURE
PROBLEM TO BE SOLVED: To provide a temporary strut which can be installed under a roof frame structure that is previously provided in a hanging manner, and also speedily disassembled.SOLUTION: A temporary strut 20 temporarily supports a roof frame structure 15. The temporary strut 20 is provided with a lifting reception stand 22 provided movably in an elevating/lowering manner across the top face of a mast 21 of a tower crane, a jack reception beam 25 provided across the upper face of the lifting reception stand 22, and a jack 26 arranged above the jack reception beam 25 to support the roof frame structure 15. According to the present invention, when the temporary strut 20 is to be relocated, the lifting reception stand 22 installed on the top of the mast 21 is lowered to secure a clearance space between the roof frame structure 15 and the top of the mast 21, so that the tip end part of lifting equipment can be inserted into the clearance space to lift up and remove the mast 21.SELECTED DRAWING: Figure 5
【課題】予め架設された屋根架構の下に容易に設置することが可能で、かつ迅速に解体できる仮設支柱を提供すること。【解決手段】仮設支柱20は、屋根架構15を仮支持する。この仮設支柱20は、タワークレーンのマスト21の頂部に設置された昇降可能な昇降受け台22と、昇降受け台22の上面に架設されたジャッキ受け梁25と、ジャッキ受け梁25の上に配置されて屋根架構15を支持するジャッキ26と、を備える。本発明によれば、仮設支柱20を移設する際には、マスト21の頂部に設置された昇降受け台22を下降させ、屋根架構15とマスト21の頂部との間に隙間空間を確保することで、隙間空間に揚重機の先端部を挿入して、マスト21を吊り上げて、撤去することができる。【選択図】図5
TEMPORARY STRUT AND CONSTRUCTION METHOD OF ROOF FRAME STRUCTURE
仮設支柱および屋根架構の構築方法
YAJIMA KIYOSHI (Autor:in) / ISHIBASHI MASAHIRO (Autor:in) / HISANUMA SHIRO (Autor:in)
14.06.2018
Patent
Elektronische Ressource
Japanisch
Frame support system using temporary strut for top-down method and construction method thereof
Europäisches Patentamt | 2019
|SUPPORT STRUCTURE OF TEMPORARY STRUT FOR CONSTRUCTION PERIOD REDUCTION
Europäisches Patentamt | 2020
SUPPORT STRUCTURE OF TEMPORARY STRUT FOR CONSTRUCTION PERIOD REDUCTION
Europäisches Patentamt | 2019
|