Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR CONSTRUCTING BATHROOM UNIT
PROBLEM TO BE SOLVED: To provide a method for constructing a bathroom unit which can facilitate assembly work of a bathtub and a drain portion.SOLUTION: The bathroom unit can store warm water in a bathtub 10 and discharge the warm water from the bathtub 10 through a drain portion 3 connected to the bathtub 10. The method for constructing the bathroom unit comprises: a first step of installing a cradle 81 supporting the bathtub 10; a second step of connecting a downstream side end of the drain portion 3 to a building side drain port 92 and disposing the drain portion 3 inside the cradle 81; a third step of placing the bathtub 10 on the cradle 81 so as to be positioned above the drain portion 3; and a fourth step of connecting an upstream side end of the drain portion 3 to a drain port 10c provided in the bathtub 10.SELECTED DRAWING: Figure 5
【課題】浴槽および排水部の組立作業を容易に行うことができる浴室ユニットの施工方法を提供する。【解決手段】浴室ユニットは、浴槽10に湯を溜め、浴槽10に連結された排水部3によって浴槽10から湯を排出可能としてある。浴室ユニットの施工方法は、浴槽10を支持する架台81を設置する第1工程と、排水部3の下流側端部を建築側排水口92に連結し、排水部3を架台81の内側に配設する第2工程と、排水部3の上方に位置するように浴槽10を架台81に載置する第3工程と、排水部3の上流側端部を浴槽10に設けられた排水口10cに連結する第4工程とを備える。【選択図】図5
METHOD FOR CONSTRUCTING BATHROOM UNIT
PROBLEM TO BE SOLVED: To provide a method for constructing a bathroom unit which can facilitate assembly work of a bathtub and a drain portion.SOLUTION: The bathroom unit can store warm water in a bathtub 10 and discharge the warm water from the bathtub 10 through a drain portion 3 connected to the bathtub 10. The method for constructing the bathroom unit comprises: a first step of installing a cradle 81 supporting the bathtub 10; a second step of connecting a downstream side end of the drain portion 3 to a building side drain port 92 and disposing the drain portion 3 inside the cradle 81; a third step of placing the bathtub 10 on the cradle 81 so as to be positioned above the drain portion 3; and a fourth step of connecting an upstream side end of the drain portion 3 to a drain port 10c provided in the bathtub 10.SELECTED DRAWING: Figure 5
【課題】浴槽および排水部の組立作業を容易に行うことができる浴室ユニットの施工方法を提供する。【解決手段】浴室ユニットは、浴槽10に湯を溜め、浴槽10に連結された排水部3によって浴槽10から湯を排出可能としてある。浴室ユニットの施工方法は、浴槽10を支持する架台81を設置する第1工程と、排水部3の下流側端部を建築側排水口92に連結し、排水部3を架台81の内側に配設する第2工程と、排水部3の上方に位置するように浴槽10を架台81に載置する第3工程と、排水部3の上流側端部を浴槽10に設けられた排水口10cに連結する第4工程とを備える。【選択図】図5
METHOD FOR CONSTRUCTING BATHROOM UNIT
浴室ユニットの施工方法
IIO KAZUNORI (Autor:in) / HORIE NAOYA (Autor:in)
26.07.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E03C
DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER
,
Hausinstallationen für Frisch- oder Abwasser
BATHROOM UNIT, METHOD FOR CONSTRUCTING BATHROOM UNIT, AND DRAIN PLUG
Europäisches Patentamt | 2018
|FRAME FOR CONSTRUCTING BATHROOM AND METHOD FOR CONSTRUCTING BATHROOM FLOOR USING THE SAME
Europäisches Patentamt | 2020
FRAME FOR CONSTRUCTING BATHROOM AND METHOD FOR CONSTRUCTING BATHROOM FLOOR USING THE SAME
Europäisches Patentamt | 2020
|