Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
HALF-PRECAST FLOOR SLAB
PROBLEM TO BE SOLVED: To provide a half-precast floor slab capable of imparting appropriate prestress while securing a crack strength even when thin.SOLUTION: A precast concrete 10 of a half-precast floor slab 2 is set to have a flat plate shape and higher strength than that of a top concrete 3. A tendon 11 is embedded into the precast concrete 10 in a tension state. A thickness tof the precast concrete 10 is set at t=70 mm or more and 100 mm or less. A tension force F of 50 kN to 140 kN is introduced into the tension 11. A point formed by plotting the thickness and tension force on a graph does not exceed a line L formed by connecting a point (a) with a thickness of 70 mm and a tension force 110 kN, a point (b) with a thickness of 80 mm and a tension force of 130 kN, and a point (c) with a thickness of 90 mm and a tension force 140 kN.SELECTED DRAWING: Figure 10
【課題】薄肉でもひび割れ強度を確保しながら適度なプレストレスを付与できるハーフプレキャスト床スラブを提供する。【解決手段】ハーフプレキャスト床スラブ2のプレキャストコンクリート10を平板状かつトップコンクリート3より高強度とする。プレキャストコンクリート10内に緊張材11を緊張状態で埋設する。プレキャストコンクリート10の厚さt2を、t=70mm以上100mm以下とする。緊張材11に50kN〜140kNの緊張力Fを導入する。更に、前記厚さ及び緊張力をグラフ上でプロットした点が、厚さ70mm、緊張力110kNの点aと、厚さ80mm、緊張力130kNの点bと、厚さ90mm、緊張力140kNの点cを結ぶ線Lを上回らないようにする。【選択図】図10
HALF-PRECAST FLOOR SLAB
PROBLEM TO BE SOLVED: To provide a half-precast floor slab capable of imparting appropriate prestress while securing a crack strength even when thin.SOLUTION: A precast concrete 10 of a half-precast floor slab 2 is set to have a flat plate shape and higher strength than that of a top concrete 3. A tendon 11 is embedded into the precast concrete 10 in a tension state. A thickness tof the precast concrete 10 is set at t=70 mm or more and 100 mm or less. A tension force F of 50 kN to 140 kN is introduced into the tension 11. A point formed by plotting the thickness and tension force on a graph does not exceed a line L formed by connecting a point (a) with a thickness of 70 mm and a tension force 110 kN, a point (b) with a thickness of 80 mm and a tension force of 130 kN, and a point (c) with a thickness of 90 mm and a tension force 140 kN.SELECTED DRAWING: Figure 10
【課題】薄肉でもひび割れ強度を確保しながら適度なプレストレスを付与できるハーフプレキャスト床スラブを提供する。【解決手段】ハーフプレキャスト床スラブ2のプレキャストコンクリート10を平板状かつトップコンクリート3より高強度とする。プレキャストコンクリート10内に緊張材11を緊張状態で埋設する。プレキャストコンクリート10の厚さt2を、t=70mm以上100mm以下とする。緊張材11に50kN〜140kNの緊張力Fを導入する。更に、前記厚さ及び緊張力をグラフ上でプロットした点が、厚さ70mm、緊張力110kNの点aと、厚さ80mm、緊張力130kNの点bと、厚さ90mm、緊張力140kNの点cを結ぶ線Lを上回らないようにする。【選択図】図10
HALF-PRECAST FLOOR SLAB
ハーフプレキャスト床スラブ
MASUDA YASUHIKO (Autor:in) / NIWA HIRONORI (Autor:in) / KIKUCHI MASAHIKO (Autor:in) / FUJIO NAOTO (Autor:in) / NISHINO YOSHIKAZU (Autor:in) / NAKAZAWA MOTOHIRO (Autor:in) / SAKAGAMI NORIO (Autor:in) / MATSUTANI TERUO (Autor:in) / MUKOYAMA ATSUSHI (Autor:in)
20.09.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
PRECAST FLOOR SLAB JOINT STRUCTURE AND PRECAST FLOOR SLAB
Europäisches Patentamt | 2021
|PRECAST FLOOR SLAB INSTALLATION METHOD AND PRECAST FLOOR SLAB
Europäisches Patentamt | 2018
|PRECAST FLOOR SLAB INSTALLATION JIG AND PRECAST FLOOR SLAB CONNECTION METHOD
Europäisches Patentamt | 2024
|PRODUCTION METHOD OF HALF-PRECAST SLAB AND HALF-PRECAST SLAB
Europäisches Patentamt | 2015
|