Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PRECAST CONCRETE RETAINING WALL, PRECAST CONCRETE RETAINING WALL MANUFACTURING APPARATUS, METHOD FOR MANUFACTURING PRECAST CONCRETE RETAINING WALL
PROBLEM TO BE SOLVED: To provide a precast concrete retaining wall having high aseismatic performance, a precast concrete retaining wall creation panel, and a method for manufacturing a precast concrete retaining wall.SOLUTION: A fitting hole 10 for fitting a unit plate stone 3 with a plate stone fitting bolt set is formed at a position that corresponds to a position at which the unit plate stone 3 is aligned and arranged in a steel form panel 7 and corresponds to a fitting hole 5 of the unit plate stone 3. The plurality of unit plate stones 3 are aligned and arranged on the surface of the steel form panel 7 in such a form that a finished surface 11 thereof is brought into close contact with the surface of the steel form plate 7. A peeling prevention metal fitting 4 is mounted on a concrete joint surface 12 of the unit plate stone 3 in the state. Meanwhile, the plurality of unit plate stones 3 are bonded to each other by an adhesive, and the fitting hole 5 formed on an adhesion part between the plurality of unit plate stones 3 is caulked in order to prevent cement outflow.SELECTED DRAWING: Figure 7
【課題】高い耐震性能を具えるプレキャストコンクリート擁壁、プレキャストコンクリート擁壁作成パネル、プレキャストコンクリート擁壁の製造方法を提供する。【解決手段】鋼製型枠パネル7に単位板石3を整列配置する位置に対応した位置であって、単位板石3の取付穴5に対応した位置に、板石取付ボルトセットによって単位板石3を取り付けるための取付穴10を形成する。次に複数の単位板石3の仕上げ面11を鋼製型枠パネル7表面に密着させる態様で鋼製型枠パネル7表面上に整列配置する。その状態で単位板石3のコンクリート接合面12には剥離防止金具4を取り付ける。一方、接着剤により複数の単位板石3間を接着し、その複数の単位板石3相互間の接着部に形成された取付穴5にセメント流出を防ぐためのコーキングを行う。【選択図】図7
PRECAST CONCRETE RETAINING WALL, PRECAST CONCRETE RETAINING WALL MANUFACTURING APPARATUS, METHOD FOR MANUFACTURING PRECAST CONCRETE RETAINING WALL
PROBLEM TO BE SOLVED: To provide a precast concrete retaining wall having high aseismatic performance, a precast concrete retaining wall creation panel, and a method for manufacturing a precast concrete retaining wall.SOLUTION: A fitting hole 10 for fitting a unit plate stone 3 with a plate stone fitting bolt set is formed at a position that corresponds to a position at which the unit plate stone 3 is aligned and arranged in a steel form panel 7 and corresponds to a fitting hole 5 of the unit plate stone 3. The plurality of unit plate stones 3 are aligned and arranged on the surface of the steel form panel 7 in such a form that a finished surface 11 thereof is brought into close contact with the surface of the steel form plate 7. A peeling prevention metal fitting 4 is mounted on a concrete joint surface 12 of the unit plate stone 3 in the state. Meanwhile, the plurality of unit plate stones 3 are bonded to each other by an adhesive, and the fitting hole 5 formed on an adhesion part between the plurality of unit plate stones 3 is caulked in order to prevent cement outflow.SELECTED DRAWING: Figure 7
【課題】高い耐震性能を具えるプレキャストコンクリート擁壁、プレキャストコンクリート擁壁作成パネル、プレキャストコンクリート擁壁の製造方法を提供する。【解決手段】鋼製型枠パネル7に単位板石3を整列配置する位置に対応した位置であって、単位板石3の取付穴5に対応した位置に、板石取付ボルトセットによって単位板石3を取り付けるための取付穴10を形成する。次に複数の単位板石3の仕上げ面11を鋼製型枠パネル7表面に密着させる態様で鋼製型枠パネル7表面上に整列配置する。その状態で単位板石3のコンクリート接合面12には剥離防止金具4を取り付ける。一方、接着剤により複数の単位板石3間を接着し、その複数の単位板石3相互間の接着部に形成された取付穴5にセメント流出を防ぐためのコーキングを行う。【選択図】図7
PRECAST CONCRETE RETAINING WALL, PRECAST CONCRETE RETAINING WALL MANUFACTURING APPARATUS, METHOD FOR MANUFACTURING PRECAST CONCRETE RETAINING WALL
プレキャストコンクリート擁壁、プレキャストコンクリート擁壁製造装置、プレキャストコンクリート擁壁の製造方法
IMAMURA SHOZO (Autor:in)
20.09.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen