Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WORKSPACE FORMATION FOR REPAIRING WALL SURFACE AND WORKSPACE FORMATION METHOD FOR REPAIRING WALL SURFACE
PROBLEM TO BE SOLVED: To provide a workspace formation for repairing a wall surface which makes it possible to safely and efficiently repair damages on underwater walls such as concrete quay walls and breakwaters, and a workspace formation method for repairing a wall surface.SOLUTION: A horizontally elongated front closing panel 2 is installed on a seabed 51 with a gap serving as a working space S between a repair wall surface 52A of a concrete breakwater 52 constructed on the seabed ground 51. Side closing panels 6, 6 are provided at both longitudinal ends of the front closing panel 2. The side closing panel 6 defines the working space S in a water-impermeable state by bringing distal end faces of a large number of closing members 9 into contact with the repair wall face 52A. A concrete plate 11 serving as a weight is stored in a weight storage portion 4 of the front closing panel 2 and weight is given to the front closing panel 2 to ensure stability in water.SELECTED DRAWING: Figure 1
【課題】コンクリート製の岸壁、防波堤等の水中壁面の損傷の補修作業を安全に、かつ効率良く行うことを可能にする壁面補修用作業空間形成物及び壁面補修用作業空間形成方法を提供する。【解決手段】海底地盤51に構築したコンクリート製防波堤52の補修壁面52Aとの間に作業空間Sとなる間隙を存して海底地盤51上に横長の前面閉塞パネル2を設置する。前面閉塞パネル2の長手方向両端に側面閉塞パネル6、6が設けてある。側面閉塞パネル6は補修壁面52Aに多数本の閉塞材9の先端面を当接させることにより作業空間Sを遮水状態に画成している。前面閉塞パネル2の錘格納部4に錘となるコンクリート板11を格納し、前面閉塞パネル2に重量を持たせて水中での安定性を確保している。【選択図】図1
WORKSPACE FORMATION FOR REPAIRING WALL SURFACE AND WORKSPACE FORMATION METHOD FOR REPAIRING WALL SURFACE
PROBLEM TO BE SOLVED: To provide a workspace formation for repairing a wall surface which makes it possible to safely and efficiently repair damages on underwater walls such as concrete quay walls and breakwaters, and a workspace formation method for repairing a wall surface.SOLUTION: A horizontally elongated front closing panel 2 is installed on a seabed 51 with a gap serving as a working space S between a repair wall surface 52A of a concrete breakwater 52 constructed on the seabed ground 51. Side closing panels 6, 6 are provided at both longitudinal ends of the front closing panel 2. The side closing panel 6 defines the working space S in a water-impermeable state by bringing distal end faces of a large number of closing members 9 into contact with the repair wall face 52A. A concrete plate 11 serving as a weight is stored in a weight storage portion 4 of the front closing panel 2 and weight is given to the front closing panel 2 to ensure stability in water.SELECTED DRAWING: Figure 1
【課題】コンクリート製の岸壁、防波堤等の水中壁面の損傷の補修作業を安全に、かつ効率良く行うことを可能にする壁面補修用作業空間形成物及び壁面補修用作業空間形成方法を提供する。【解決手段】海底地盤51に構築したコンクリート製防波堤52の補修壁面52Aとの間に作業空間Sとなる間隙を存して海底地盤51上に横長の前面閉塞パネル2を設置する。前面閉塞パネル2の長手方向両端に側面閉塞パネル6、6が設けてある。側面閉塞パネル6は補修壁面52Aに多数本の閉塞材9の先端面を当接させることにより作業空間Sを遮水状態に画成している。前面閉塞パネル2の錘格納部4に錘となるコンクリート板11を格納し、前面閉塞パネル2に重量を持たせて水中での安定性を確保している。【選択図】図1
WORKSPACE FORMATION FOR REPAIRING WALL SURFACE AND WORKSPACE FORMATION METHOD FOR REPAIRING WALL SURFACE
壁面補修用作業空間形成物及び壁面補修用作業空間形成方法
MINAMI OSAMU (Autor:in)
18.10.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Outer wall repairing device and outer wall repairing method
Europäisches Patentamt | 2023
|Repairing material for repairing wall and repairing method thereof
Europäisches Patentamt | 2022
|