Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ION CONDUCTIVE CONCRETE PILED BLOCK WALL BODY
PROBLEM TO BE SOLVED: To provide an ion conductive concrete piled block wall body of which wall body generates heat stably.SOLUTION: A pile block pair of each row comprises together a terminal block 7, and a first block 5 and a second block 6 arranged from upward to downward in order each other and the terminal block 7 is situated lowermost of the pile block pair and the first block 5 or the second block 6 of lowermost is arranged on the terminal block 7 and a length of the first block 5 is longer than a length of the second block 6 and a concrete block 8 is arranged between the second blocks 6 adjoining each other and a liquid collection pool is arranged at each upper end of the first block 5, the second block 6 and the terminal block 7 and all liquid collection pools in each pile block pair of each row are in communication with each other and an insertion pipe 10 of an injection liquid pipe system communicates with the liquid collection pool lowermost and an air duct pipe 9 of an air duct pipe system communicates with the liquid collection pool uppermost and the air duct pipe system and the injection liquid pipe system connect together to an additive agent system.SELECTED DRAWING: Figure 1
【課題】壁体が安定に発熱するイオン導電コンクリート積みブロック壁体を提供する。【解決手段】各列の積みブロック組は共に端末ブロック7と、上から下へ順次相互に畳置されている第一ブロック5及び第二ブロック6とを含み、端末ブロック7は積みブロック組の最下方に位置し、最下の第一ブロック5又は第二ブロック6は端末ブロック7の上に畳置され、第一ブロック5の長さは第二ブロック6の長さよりも長く、隣り合う二つの第二ブロック6同士の間にコンクリートブロック8が設けられ、第一ブロック5、第二ブロック6と端末ブロック7のそれぞれの上端に集液プールが設けられ、各列の積みブロック組毎におけるすべての集液プールは相互に連通し、注液管系統の插入管10は最下の集液プールに相通し、通気管系統の通気管9は最上の集液プールに相通し、通気管系統と注液管系統は共に添料系統に接続する。【選択図】図1
ION CONDUCTIVE CONCRETE PILED BLOCK WALL BODY
PROBLEM TO BE SOLVED: To provide an ion conductive concrete piled block wall body of which wall body generates heat stably.SOLUTION: A pile block pair of each row comprises together a terminal block 7, and a first block 5 and a second block 6 arranged from upward to downward in order each other and the terminal block 7 is situated lowermost of the pile block pair and the first block 5 or the second block 6 of lowermost is arranged on the terminal block 7 and a length of the first block 5 is longer than a length of the second block 6 and a concrete block 8 is arranged between the second blocks 6 adjoining each other and a liquid collection pool is arranged at each upper end of the first block 5, the second block 6 and the terminal block 7 and all liquid collection pools in each pile block pair of each row are in communication with each other and an insertion pipe 10 of an injection liquid pipe system communicates with the liquid collection pool lowermost and an air duct pipe 9 of an air duct pipe system communicates with the liquid collection pool uppermost and the air duct pipe system and the injection liquid pipe system connect together to an additive agent system.SELECTED DRAWING: Figure 1
【課題】壁体が安定に発熱するイオン導電コンクリート積みブロック壁体を提供する。【解決手段】各列の積みブロック組は共に端末ブロック7と、上から下へ順次相互に畳置されている第一ブロック5及び第二ブロック6とを含み、端末ブロック7は積みブロック組の最下方に位置し、最下の第一ブロック5又は第二ブロック6は端末ブロック7の上に畳置され、第一ブロック5の長さは第二ブロック6の長さよりも長く、隣り合う二つの第二ブロック6同士の間にコンクリートブロック8が設けられ、第一ブロック5、第二ブロック6と端末ブロック7のそれぞれの上端に集液プールが設けられ、各列の積みブロック組毎におけるすべての集液プールは相互に連通し、注液管系統の插入管10は最下の集液プールに相通し、通気管系統の通気管9は最上の集液プールに相通し、通気管系統と注液管系統は共に添料系統に接続する。【選択図】図1
ION CONDUCTIVE CONCRETE PILED BLOCK WALL BODY
イオン導電コンクリート積みブロック壁体
ZHAO RUOHONG (Autor:in) / FAN DAOBO (Autor:in) / XU AN (Autor:in) / FU JIYANG (Autor:in) / LIU AIRONG (Autor:in) / WU JIURONG (Autor:in)
29.11.2018
Patent
Elektronische Ressource
Japanisch
Concrete retaining wall on piled foundations
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1935
|Engineering Index Backfile | 1933
|Tema Archiv | 2013
|