COLUMN-BEAM JOINT STRUCTURE WITH THRUST FORCE INDUCED BY SWOLLEN BEAM MEMBERS
To provide a connection structure between precast concrete columns and prestressed precast concrete beams which makes it possible to give prestress even if the secondary cable is eliminated at the beam-column joints and reduce on-site work to achieve cost reduction.SOLUTION: There is provided a column-beam joint structure in which an end portion of a precast concrete beam 3 prestressed by a primary cable for tension 4 is set on a beam receiving jaw 2 of a precast concrete column 1 and a cast-in-place concrete 17 is cast in a column-beam joint portion 13 of the beam end portion. At the center of the span, a predetermined swelling is formed on the precast concrete beam 3 to form the whole of the beam 3 in an arch shape, and a fixed load due to the slab or finish, etc. formed after the cast-in-place concrete 17 of the column-beam joint portion 13 has hardened and a live load at the time of building use act on the beam and the beam is elastically deformed to a horizontal state, so that the thrust force generated at the beam end portion is introduced as a prestressing force to the column-beam joint portion.SELECTED DRAWING: Figure 4
【課題】柱梁接合部に二次ケーブルを無くしてもプレストレスを与えることを可能にし、現場作業を減らしコストダウンを図れるプレキャストコンクリート柱とプレストレスプレキャストコンクリート梁の接続構造を提供する。【解決手段】プレキャストコンクリート柱1の梁受け顎2に、緊張用一次ケーブル4でプレストレスが付与されたプレキャストコンクリート梁3の端部が設置され、梁端部の柱梁接合部13に現場打ちコンクリート17が打設された柱梁接合構造であって、スパンの中央において、プレキャストコンクリート梁3に所定のむくりを形成して梁3全体がアーチ状に形成され、柱梁接合部13の現場打ちコンクリート17が硬化した後に形成されたスラブや仕上げ等による固定荷重および建物供用時の積載荷重が梁に作用し、梁が水平状態に弾性変形することによって梁端部に生じさせられたスラスト力がプレストレス力として柱梁接合部に導入される。【選択図】図4
COLUMN-BEAM JOINT STRUCTURE WITH THRUST FORCE INDUCED BY SWOLLEN BEAM MEMBERS
To provide a connection structure between precast concrete columns and prestressed precast concrete beams which makes it possible to give prestress even if the secondary cable is eliminated at the beam-column joints and reduce on-site work to achieve cost reduction.SOLUTION: There is provided a column-beam joint structure in which an end portion of a precast concrete beam 3 prestressed by a primary cable for tension 4 is set on a beam receiving jaw 2 of a precast concrete column 1 and a cast-in-place concrete 17 is cast in a column-beam joint portion 13 of the beam end portion. At the center of the span, a predetermined swelling is formed on the precast concrete beam 3 to form the whole of the beam 3 in an arch shape, and a fixed load due to the slab or finish, etc. formed after the cast-in-place concrete 17 of the column-beam joint portion 13 has hardened and a live load at the time of building use act on the beam and the beam is elastically deformed to a horizontal state, so that the thrust force generated at the beam end portion is introduced as a prestressing force to the column-beam joint portion.SELECTED DRAWING: Figure 4
【課題】柱梁接合部に二次ケーブルを無くしてもプレストレスを与えることを可能にし、現場作業を減らしコストダウンを図れるプレキャストコンクリート柱とプレストレスプレキャストコンクリート梁の接続構造を提供する。【解決手段】プレキャストコンクリート柱1の梁受け顎2に、緊張用一次ケーブル4でプレストレスが付与されたプレキャストコンクリート梁3の端部が設置され、梁端部の柱梁接合部13に現場打ちコンクリート17が打設された柱梁接合構造であって、スパンの中央において、プレキャストコンクリート梁3に所定のむくりを形成して梁3全体がアーチ状に形成され、柱梁接合部13の現場打ちコンクリート17が硬化した後に形成されたスラブや仕上げ等による固定荷重および建物供用時の積載荷重が梁に作用し、梁が水平状態に弾性変形することによって梁端部に生じさせられたスラスト力がプレストレス力として柱梁接合部に導入される。【選択図】図4
COLUMN-BEAM JOINT STRUCTURE WITH THRUST FORCE INDUCED BY SWOLLEN BEAM MEMBERS
梁部材のむくりによるスラスト力が導入された柱梁接合構造
KUROSAWA RYOHEI (Autor:in)
20.12.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
COLUMN-BEAM JOINT STRUCTURE AND COLUMN-BEAM JOINT METHOD
Europäisches Patentamt | 2024
|COLUMN BEAM JOINT STRUCTURE AND COLUMN BEAM JOINT METHOD
Europäisches Patentamt | 2020
|COLUMN-BEAM JOINT STRUCTURE AND COLUMN-BEAM JOINT METHOD
Europäisches Patentamt | 2019
|COLUMN-BEAM JOINT MEMBER AND COLUMN-BEAM JOINT STRUCTURE
Europäisches Patentamt | 2020
|COLUMN-BEAM JOINT STRUCTURE AND COLUMN-BEAM JOINT METHOD
Europäisches Patentamt | 2024
|