REVETMENT CONSTRUCTION METHOD
To provide a revetment construction method capable of efficiently constructing a revetment in a short period.SOLUTION: A revetment construction method for constructing a revetment by disposing a box-shaped revetment structure on a submarine ground comprises: a first portion construction step of placing installation materials and constructing a first portion of the revetment structure, which is from a bottom face to a halfway height that can be floated on water, on a land; a formwork member installation step of installing a formwork member along an outer shape of a second portion which is upper remaining part of the revetment structure except the first portion, on an upper part of the first portion; a transportation step of transporting the first portion to an object area where the revetment structure is disposed in a state in which the first portion and the formwork member are floated on the water; and a second portion construction step of constructing the second portion on the first portion by placing the installation materials inside the formwork member.SELECTED DRAWING: Figure 1
【課題】短期間で効率的に護岸を構築することが可能な護岸構築方法を提供する。【解決手段】護岸構築方法は、海底地盤上に函状の護岸構造物を配置して護岸を構築する護岸構築方法であって、陸上において打設部材を打設し、護岸構造物のうち底面から水に浮上可能となる途中の高さまでの第1部分を建造する第1部分建造工程と、護岸構造物のうち第1部分の上部の残りの部分である第2部分の外形に沿った型枠部材を、第1部分の上部に設置する型枠部材設置工程と、第1部分型枠部材を水に浮かせた状態とし、護岸構造物が配置される対象区域に第1部分を運搬する運搬工程と、型枠部材の内部に打設材料を打設し、第1部分の上部に第2部分を建造する第2部分建造工程とを含む。【選択図】図1
REVETMENT CONSTRUCTION METHOD
To provide a revetment construction method capable of efficiently constructing a revetment in a short period.SOLUTION: A revetment construction method for constructing a revetment by disposing a box-shaped revetment structure on a submarine ground comprises: a first portion construction step of placing installation materials and constructing a first portion of the revetment structure, which is from a bottom face to a halfway height that can be floated on water, on a land; a formwork member installation step of installing a formwork member along an outer shape of a second portion which is upper remaining part of the revetment structure except the first portion, on an upper part of the first portion; a transportation step of transporting the first portion to an object area where the revetment structure is disposed in a state in which the first portion and the formwork member are floated on the water; and a second portion construction step of constructing the second portion on the first portion by placing the installation materials inside the formwork member.SELECTED DRAWING: Figure 1
【課題】短期間で効率的に護岸を構築することが可能な護岸構築方法を提供する。【解決手段】護岸構築方法は、海底地盤上に函状の護岸構造物を配置して護岸を構築する護岸構築方法であって、陸上において打設部材を打設し、護岸構造物のうち底面から水に浮上可能となる途中の高さまでの第1部分を建造する第1部分建造工程と、護岸構造物のうち第1部分の上部の残りの部分である第2部分の外形に沿った型枠部材を、第1部分の上部に設置する型枠部材設置工程と、第1部分型枠部材を水に浮かせた状態とし、護岸構造物が配置される対象区域に第1部分を運搬する運搬工程と、型枠部材の内部に打設材料を打設し、第1部分の上部に第2部分を建造する第2部分建造工程とを含む。【選択図】図1
REVETMENT CONSTRUCTION METHOD
護岸構築方法
WAGI TAKATSU (Autor:in) / NISHI KAZUHIRO (Autor:in) / KIHARA KAZUYOSHI (Autor:in)
27.12.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
REVETMENT STRUCTURE, AND REVETMENT CONSTRUCTION METHOD
Europäisches Patentamt | 2020
|JOINT STRUCTURE, REVETMENT STRUCTURE AND REVETMENT CONSTRUCTION METHOD
Europäisches Patentamt | 2017
|REVETMENT STRUCTURE AND CONSTRUCTION METHOD OF REVETMENT STRUCTURE
Europäisches Patentamt | 2018
|