Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STORAGE STRUCTURE OF HEAVY METAL POLLUTED SOIL
To effectively enhance contact frequency between an adsorbent and a heavy metal in an adsorption layer while making reworkability easy.SOLUTION: A storage structure has a banking body part 1A in which at least a water shielding layer 2 and a polluted soil layer 4 containing a heavy metal are laminated from a foundation side G, and a leachate flowing down on an upper surface of the water shielding layer 3 from the polluted soil layer 4 is introduced to a side surface 2A of the water shielding layer 2, and an adsorption layer 6 which is arranged in contact with at least the side surface 2A of the water shielding layer 2, and in which the leachate leaching from the banking body part 1A is distributed and an adsorbent adsorbing the heavy metal contained in the leachate is mixed.SELECTED DRAWING: Figure 1
【課題】再施工性を容易にしつつ、吸着層における吸着材と重金属との接触頻度を効果的に高める。【解決手段】地盤側Gから少なくとも遮水層2及び、重金属を含む汚染土層4が積層され、汚染土層4から遮水層3の上面に流下する浸出水が遮水層2の側面2Aに向けて案内される盛土本体部1Aと、少なくとも遮水層2の側面2Aに接して設けられ、盛土本体部1Aから浸出する浸出水を流通させると共に、浸出水に含まれる重金属を吸着する吸着材が混合された吸着層6とを備えた。【選択図】図1
STORAGE STRUCTURE OF HEAVY METAL POLLUTED SOIL
To effectively enhance contact frequency between an adsorbent and a heavy metal in an adsorption layer while making reworkability easy.SOLUTION: A storage structure has a banking body part 1A in which at least a water shielding layer 2 and a polluted soil layer 4 containing a heavy metal are laminated from a foundation side G, and a leachate flowing down on an upper surface of the water shielding layer 3 from the polluted soil layer 4 is introduced to a side surface 2A of the water shielding layer 2, and an adsorption layer 6 which is arranged in contact with at least the side surface 2A of the water shielding layer 2, and in which the leachate leaching from the banking body part 1A is distributed and an adsorbent adsorbing the heavy metal contained in the leachate is mixed.SELECTED DRAWING: Figure 1
【課題】再施工性を容易にしつつ、吸着層における吸着材と重金属との接触頻度を効果的に高める。【解決手段】地盤側Gから少なくとも遮水層2及び、重金属を含む汚染土層4が積層され、汚染土層4から遮水層3の上面に流下する浸出水が遮水層2の側面2Aに向けて案内される盛土本体部1Aと、少なくとも遮水層2の側面2Aに接して設けられ、盛土本体部1Aから浸出する浸出水を流通させると共に、浸出水に含まれる重金属を吸着する吸着材が混合された吸着層6とを備えた。【選択図】図1
STORAGE STRUCTURE OF HEAVY METAL POLLUTED SOIL
重金属汚染土の貯蔵構造
MIURA TOSHIHIKO (Autor:in) / NISHIDA KENJI (Autor:in) / YAMADA YUKI (Autor:in) / MORISHITA TOMOKI (Autor:in) / HASEGAWA HAJIME (Autor:in)
24.01.2019
Patent
Elektronische Ressource
Japanisch
Method for electrokinetic remediation of heavy metal copper polluted soil
Europäisches Patentamt | 2021
|Curing agent for repairing heavy metal polluted soil and application thereof
Europäisches Patentamt | 2021
|Artificial neural network prediction models of heavy metal polluted soil resistivity
Taylor & Francis Verlag | 2021
|Physical and Microscopic Characteristics Experiments with Heavy Metal Polluted Cohesive Soil
British Library Conference Proceedings | 2016
|