CIVIL ENGINEERING CONSTRUCTION METHOD AND CIVIL ENGINEERING CONSTRUCTION PROGRAM
To save labor surveying work and creation of drawings during civil engineering work.SOLUTION: A GNSS mobile station 12 and a computer 14 are mounted on a construction machine 10, the computer 12 has a monitor 13, a data acquisition unit 24 for acquiring a position of the construction machine 10 having travelled from the GNSS mobile station 12 and the height at each position, a display control unit 25 for causing the monitor 13 to display the position at which the construction machine 10 travelled on the map data 19, and a drawing preparation unit 26 for preparing a three-dimensional drawing based on the position and the height. The construction machine 10 travels over the entire civil construction site and the data acquisition unit 24 acquires a position and a height of an entire construction work site, and the drawing preparation unit 26 prepares a current state drawing of the civil engineering work site on the basis of the position and the height acquired at the data acquisition unit 24.SELECTED DRAWING: Figure 10
【課題】 土木施工の際の測量作業及び図面の作成を省力化する。【解決手段】 建設機械10にGNSS移動局12及びコンピュータ14を装着し、コンピュータ12は、モニタ13と、GNSS移動局12から建設機械10が走行した位置及び各位置における高さを取得するデータ取得部24と、建設機械10が走行した位置を地図データ19上でモニタ13に表示させる表示制御部25と、位置及び高さに基づいて三次元の図面を作成する図面作成部26と、を有しており、建設機械10を土木施工現場全体で走行させ、データ取得部24によって土木施工現場全体の位置及び高さを取得し、データ取得部24が取得した位置及び高さに基づいて、図面作成部26が土木施工現場の現況図面を作成する。【選択図】 図10
CIVIL ENGINEERING CONSTRUCTION METHOD AND CIVIL ENGINEERING CONSTRUCTION PROGRAM
To save labor surveying work and creation of drawings during civil engineering work.SOLUTION: A GNSS mobile station 12 and a computer 14 are mounted on a construction machine 10, the computer 12 has a monitor 13, a data acquisition unit 24 for acquiring a position of the construction machine 10 having travelled from the GNSS mobile station 12 and the height at each position, a display control unit 25 for causing the monitor 13 to display the position at which the construction machine 10 travelled on the map data 19, and a drawing preparation unit 26 for preparing a three-dimensional drawing based on the position and the height. The construction machine 10 travels over the entire civil construction site and the data acquisition unit 24 acquires a position and a height of an entire construction work site, and the drawing preparation unit 26 prepares a current state drawing of the civil engineering work site on the basis of the position and the height acquired at the data acquisition unit 24.SELECTED DRAWING: Figure 10
【課題】 土木施工の際の測量作業及び図面の作成を省力化する。【解決手段】 建設機械10にGNSS移動局12及びコンピュータ14を装着し、コンピュータ12は、モニタ13と、GNSS移動局12から建設機械10が走行した位置及び各位置における高さを取得するデータ取得部24と、建設機械10が走行した位置を地図データ19上でモニタ13に表示させる表示制御部25と、位置及び高さに基づいて三次元の図面を作成する図面作成部26と、を有しており、建設機械10を土木施工現場全体で走行させ、データ取得部24によって土木施工現場全体の位置及び高さを取得し、データ取得部24が取得した位置及び高さに基づいて、図面作成部26が土木施工現場の現況図面を作成する。【選択図】 図10
CIVIL ENGINEERING CONSTRUCTION METHOD AND CIVIL ENGINEERING CONSTRUCTION PROGRAM
土木施工方法及び土木施工用プログラム
YOKOSHIMA YASUZO (Autor:in)
07.02.2019
Patent
Elektronische Ressource
Japanisch
CIVIL ENGINEERING CONSTRUCTION AND CONSTRUCTION METHOD OF CIVIL ENGINEERING CONSTRUCTION
Europäisches Patentamt | 2017
|Civil Engineering Construction
TIBKAT | 1986
|An Introduction to Civil Engineering Construction Technology in Civil Engineering Construction
BASE | 2024
|Europäisches Patentamt | 2021
|Civil engineering & marine construction
Tema Archiv | 1983