SUSPENDING SCAFFOLD AND CONSTRUCTION METHOD OF SUSPENDING SCAFFOLD
To provide a suspending scaffold and a construction method of a suspending scaffold which can improve working efficiency at the time of construction.SOLUTION: A construction method of a suspending scaffold includes: a suspending member fitting step of fitting a plurality of suspending members 6 for suspending parent pipe connection bodies 4 to a beam CR that is a part of a skeleton, of a suspending scaffold which includes a plurality of scaffold boards 2 formed into a rectangular shape, first and second parent pipe connection bodies 4 for each supporting a short side 20a and a short side 20b facing each other of the scaffold boards 2 and the suspending members 6, to the beam CR; a pipe suspending step of arranging and suspending the first and second parent pipe connection bodies 4 to the beam CR with the plurality of suspending members 6 so as to be parallel to the short side 20a and the short side 20b; and a scaffold board supporting step of each supporting the short side 20a and the short 20b of the plurality of scaffold boards 2 with the first and second parent pipe connection bodies 4.SELECTED DRAWING: Figure 10
【課題】施工時の作業効率を向上させることが可能な、吊り足場と吊り足場の施工方法を提供する。【解決手段】矩形に形成された複数枚の足場板2と、足場板2の対向する短辺20a及び短辺20bをそれぞれ支持する第1及び第2の親パイプ連結体4と、親パイプ連結体4を躯体の一部である桁CRに吊り下げる複数の吊り部材6を含む吊り足場を、桁CRに複数の吊り部材6を取り付ける吊り部材取り付け工程と、複数の吊り部材6で桁CRに第1及び第2の親パイプ連結体4を短辺20a及び短辺20bと平行に配置して吊り下げるパイプ吊り下げ工程と、複数枚の足場板2の短辺20a及び短辺20bを第1及び第2の親パイプ連結体4でそれぞれ支持する足場板支持工程により施工する。【選択図】図10
SUSPENDING SCAFFOLD AND CONSTRUCTION METHOD OF SUSPENDING SCAFFOLD
To provide a suspending scaffold and a construction method of a suspending scaffold which can improve working efficiency at the time of construction.SOLUTION: A construction method of a suspending scaffold includes: a suspending member fitting step of fitting a plurality of suspending members 6 for suspending parent pipe connection bodies 4 to a beam CR that is a part of a skeleton, of a suspending scaffold which includes a plurality of scaffold boards 2 formed into a rectangular shape, first and second parent pipe connection bodies 4 for each supporting a short side 20a and a short side 20b facing each other of the scaffold boards 2 and the suspending members 6, to the beam CR; a pipe suspending step of arranging and suspending the first and second parent pipe connection bodies 4 to the beam CR with the plurality of suspending members 6 so as to be parallel to the short side 20a and the short side 20b; and a scaffold board supporting step of each supporting the short side 20a and the short 20b of the plurality of scaffold boards 2 with the first and second parent pipe connection bodies 4.SELECTED DRAWING: Figure 10
【課題】施工時の作業効率を向上させることが可能な、吊り足場と吊り足場の施工方法を提供する。【解決手段】矩形に形成された複数枚の足場板2と、足場板2の対向する短辺20a及び短辺20bをそれぞれ支持する第1及び第2の親パイプ連結体4と、親パイプ連結体4を躯体の一部である桁CRに吊り下げる複数の吊り部材6を含む吊り足場を、桁CRに複数の吊り部材6を取り付ける吊り部材取り付け工程と、複数の吊り部材6で桁CRに第1及び第2の親パイプ連結体4を短辺20a及び短辺20bと平行に配置して吊り下げるパイプ吊り下げ工程と、複数枚の足場板2の短辺20a及び短辺20bを第1及び第2の親パイプ連結体4でそれぞれ支持する足場板支持工程により施工する。【選択図】図10
SUSPENDING SCAFFOLD AND CONSTRUCTION METHOD OF SUSPENDING SCAFFOLD
吊り足場、吊り足場の施工方法