Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
COVER STRUCTURE OF GROOVE PIT AND MAINTENANCE METHOD OF GROOVE PIT
To easily attach and detach a cover plate during maintenance after installation while not providing a step and a gap in the periphery of a groove pit and the cover plate.SOLUTION: A groove pit 20 constructed lower than a sub-floor surface 12, a receiving frame 22 provided on an opening 21 of the groove pit 20, a cover plate 30 fitted in the receiving frame 22, a first surface layer material 32 pasted onto the sub-floor surface 12, a second surface layer material 33 pasted onto the top face 31 of the cover plate 30, and a filler 34 filled between an upper end face 24 of the receiving frame 22 and the first surface layer material 32 and the second surface layer material 33 are comprised. A floor surface 11 consisting of the first surface layer material 32, the second surface layer material 33, and the filler 34 are made substantially flat.SELECTED DRAWING: Figure 1
【課題】溝ピット及び蓋板の周辺に段差と隙間を設けないようにするとともに、設置後のメンテナンスのときに容易に蓋板を着脱することができるようにする。【解決手段】下地床面12より低く構成される溝ピット20と、前記溝ピット20の開口部21に設けられる受枠22と、前記受枠22に嵌められる蓋板30と、前記下地床面12に貼設される第1表層材32と、前記蓋板30の上面31に貼設される第2表層材33と、前記受枠22の上端面24かつ前記第1表層材32と前記第2表層材33との間に充填される充填剤34と、を備え、前記第1表層材32、前記第2表層材33、及び前記充填剤34とで構成される床面11が実質的に平坦とされている。【選択図】図1
COVER STRUCTURE OF GROOVE PIT AND MAINTENANCE METHOD OF GROOVE PIT
To easily attach and detach a cover plate during maintenance after installation while not providing a step and a gap in the periphery of a groove pit and the cover plate.SOLUTION: A groove pit 20 constructed lower than a sub-floor surface 12, a receiving frame 22 provided on an opening 21 of the groove pit 20, a cover plate 30 fitted in the receiving frame 22, a first surface layer material 32 pasted onto the sub-floor surface 12, a second surface layer material 33 pasted onto the top face 31 of the cover plate 30, and a filler 34 filled between an upper end face 24 of the receiving frame 22 and the first surface layer material 32 and the second surface layer material 33 are comprised. A floor surface 11 consisting of the first surface layer material 32, the second surface layer material 33, and the filler 34 are made substantially flat.SELECTED DRAWING: Figure 1
【課題】溝ピット及び蓋板の周辺に段差と隙間を設けないようにするとともに、設置後のメンテナンスのときに容易に蓋板を着脱することができるようにする。【解決手段】下地床面12より低く構成される溝ピット20と、前記溝ピット20の開口部21に設けられる受枠22と、前記受枠22に嵌められる蓋板30と、前記下地床面12に貼設される第1表層材32と、前記蓋板30の上面31に貼設される第2表層材33と、前記受枠22の上端面24かつ前記第1表層材32と前記第2表層材33との間に充填される充填剤34と、を備え、前記第1表層材32、前記第2表層材33、及び前記充填剤34とで構成される床面11が実質的に平坦とされている。【選択図】図1
COVER STRUCTURE OF GROOVE PIT AND MAINTENANCE METHOD OF GROOVE PIT
溝ピット蓋構造及び溝ピットのメンテナンス方法
YAMASHITA TETSUKAZU (Autor:in)
11.04.2019
Patent
Elektronische Ressource
Japanisch
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
GROOVE EVALUATION DEVICE, GROOVE EVALUATION SYSTEM, AND GROOVE EVALUATION METHOD
Europäisches Patentamt | 2019
|Fertilizer groove backfilling structure and fertilizer groove backfilling method
Europäisches Patentamt | 2023
|