INSTALLATION STRUCTURE FOR OBSERVATION HOLE OF PLUMB LINE AND INSTALLATION METHOD FOR OBSERVATION HOLE OF PLUMB LINE
To provide an installation structure for an observation hole of a plumb line capable of confirming that cement milk fills a gap between a boring hole and a lining pipe, and the filling has surely been performed even when the gap is extremely small.SOLUTION: An observation hole of a plumb line includes: lining pipes 1a, 1b which are inserted into boring holes 10a, 10b; caulking materials 2a, 2b which seal a gap between the boring holes 10a, 10b and lower ends of the lining pipes 1a, 1b; hoses 3a, 3b, 4a, 4b for ensuring the filling of injected material, which penetrate the caulking materials 2a, 2b and are held by them; cement materials 5a, 5b which seal lower end sides of the caulking materials 2a, 2b. Injected materials 6a, 6b, which are injected from an upper end opening of the gap, leak from lower ends of the hoses 3a, 3b and 4a, 4b to audit corridors 7a, 7b. It can therefore be confirmed whether the injected materials 6a, 6b reach the vicinity of upper ends of the hoses 3a, 3b and 4a, 4b.SELECTED DRAWING: Figure 1
【課題】 ボーリング孔とライニング管との間隙が僅少であっても、セメントミルクが上記間隙内に充填され且つその充填が確実に行われたことを確認し得るプラムラインの観測孔の設置構造を提供する。【解決手段】 プラムラインの観測孔は、ボーリング孔10a、10b内に挿入されるライニング管1a、1bと、ボーリング孔10a、10bとライニング管1a、1bの下端の間隙を封止するコーキング材2a、2bと、コーキング材2a,2bを貫通保持された注入材充填確保用のホース3a,3b、4a、4bと、コーキング材2a、2bの下端側を封止するセメント材5a、5bを備える。上記空隙の上端開口部から注入された注入材6a,6bがホース3a,3bおよび4a,4bの下端から監査廊7a,7bに漏れ出すことで、上記注入材6a,6bが、上記ホース3a,3bおよび4a,4bの上端付近まで到達していることを確認することができる。【選択図】 図1
INSTALLATION STRUCTURE FOR OBSERVATION HOLE OF PLUMB LINE AND INSTALLATION METHOD FOR OBSERVATION HOLE OF PLUMB LINE
To provide an installation structure for an observation hole of a plumb line capable of confirming that cement milk fills a gap between a boring hole and a lining pipe, and the filling has surely been performed even when the gap is extremely small.SOLUTION: An observation hole of a plumb line includes: lining pipes 1a, 1b which are inserted into boring holes 10a, 10b; caulking materials 2a, 2b which seal a gap between the boring holes 10a, 10b and lower ends of the lining pipes 1a, 1b; hoses 3a, 3b, 4a, 4b for ensuring the filling of injected material, which penetrate the caulking materials 2a, 2b and are held by them; cement materials 5a, 5b which seal lower end sides of the caulking materials 2a, 2b. Injected materials 6a, 6b, which are injected from an upper end opening of the gap, leak from lower ends of the hoses 3a, 3b and 4a, 4b to audit corridors 7a, 7b. It can therefore be confirmed whether the injected materials 6a, 6b reach the vicinity of upper ends of the hoses 3a, 3b and 4a, 4b.SELECTED DRAWING: Figure 1
【課題】 ボーリング孔とライニング管との間隙が僅少であっても、セメントミルクが上記間隙内に充填され且つその充填が確実に行われたことを確認し得るプラムラインの観測孔の設置構造を提供する。【解決手段】 プラムラインの観測孔は、ボーリング孔10a、10b内に挿入されるライニング管1a、1bと、ボーリング孔10a、10bとライニング管1a、1bの下端の間隙を封止するコーキング材2a、2bと、コーキング材2a,2bを貫通保持された注入材充填確保用のホース3a,3b、4a、4bと、コーキング材2a、2bの下端側を封止するセメント材5a、5bを備える。上記空隙の上端開口部から注入された注入材6a,6bがホース3a,3bおよび4a,4bの下端から監査廊7a,7bに漏れ出すことで、上記注入材6a,6bが、上記ホース3a,3bおよび4a,4bの上端付近まで到達していることを確認することができる。【選択図】 図1
INSTALLATION STRUCTURE FOR OBSERVATION HOLE OF PLUMB LINE AND INSTALLATION METHOD FOR OBSERVATION HOLE OF PLUMB LINE
プラムラインの観測孔の設置構造およびプラムラインの観測孔の設置方法
TAKEUCHI KATSUMI (Autor:in) / TAKEUCHI HIDEYA (Autor:in)
18.04.2019
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Laser plumb line measuring device and laser plumb line measuring system
Europäisches Patentamt | 2020
|Plumb Line System for Double Arch Dams
ASCE | 2007
|Europäisches Patentamt | 2021
|A review and analyses of plumb-line calibration
Online Contents | 2007
|