CONSTRUCTION METHOD OF BASE-ISOLATED BUILDING
To provide a construction method of a base-isolated building, mutually hardly colliding, even if the adjacent two ridges are constructed in a state of operating a base-isolation device.SOLUTION: A construction method of a base-isolated building comprises a process of constructing a first ridge 12 supported by a base-isolation device 30, a process of constructing a second ridge 14 adjacent to the first ridge 12 and supported by the base-isolation device 30, a process of installing displacement restraint means (a stopper 40) for restraining displacement to the second ridge side 14 of the first ridge 12 or displacement to the first ridge 12 side of the second ridge 14 before constructing or when constructing the second ridge 14 and a process of removing the displacement restraint means by connecting the first ridge 12 and the second ridge 14.SELECTED DRAWING: Figure 1
【課題】隣接した2つの棟を免震装置を働かせた状態で構築しても、互いに衝突し難い免震建物の構築方法を提供する。【解決手段】免震建物の構築方法は、免震装置30に支持された第1棟12を構築する工程と、第1棟12と隣接して免震装置30に支持された第2棟14を構築する工程と、第2棟14の構築前又は構築中に、第1棟12の第2棟側14への変位又は第2棟14の第1棟12側への変位を抑制する変位抑制手段(ストッパー40)を設置する工程と、第1棟12と第2棟14とを連結し、変位抑制手段を撤去する工程と、を備える。【選択図】図1
CONSTRUCTION METHOD OF BASE-ISOLATED BUILDING
To provide a construction method of a base-isolated building, mutually hardly colliding, even if the adjacent two ridges are constructed in a state of operating a base-isolation device.SOLUTION: A construction method of a base-isolated building comprises a process of constructing a first ridge 12 supported by a base-isolation device 30, a process of constructing a second ridge 14 adjacent to the first ridge 12 and supported by the base-isolation device 30, a process of installing displacement restraint means (a stopper 40) for restraining displacement to the second ridge side 14 of the first ridge 12 or displacement to the first ridge 12 side of the second ridge 14 before constructing or when constructing the second ridge 14 and a process of removing the displacement restraint means by connecting the first ridge 12 and the second ridge 14.SELECTED DRAWING: Figure 1
【課題】隣接した2つの棟を免震装置を働かせた状態で構築しても、互いに衝突し難い免震建物の構築方法を提供する。【解決手段】免震建物の構築方法は、免震装置30に支持された第1棟12を構築する工程と、第1棟12と隣接して免震装置30に支持された第2棟14を構築する工程と、第2棟14の構築前又は構築中に、第1棟12の第2棟側14への変位又は第2棟14の第1棟12側への変位を抑制する変位抑制手段(ストッパー40)を設置する工程と、第1棟12と第2棟14とを連結し、変位抑制手段を撤去する工程と、を備える。【選択図】図1
CONSTRUCTION METHOD OF BASE-ISOLATED BUILDING
免震建物の構築方法
KANEDA TAKAOKI (Autor:in) / IWAMA KAZUHIRO (Autor:in) / MARUKAWA TOMOTERU (Autor:in)
20.06.2019
Patent
Elektronische Ressource
Japanisch
BASE-ISOLATED BUILDING AND CONSTRUCTION METHOD FOR BASE-ISOLATED STRUCTURE
Europäisches Patentamt | 2019
|