Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SCAFFOLD CONSTRUCTION METHOD
To provide a scaffold construction method for constructing a work scaffold around a bridge pier of a bridge installed on a water area, without using a barge.SOLUTION: A scaffold construction method for constructing a work scaffold 4 using a suspended scaffold 2 around a bridge pier 1 of a bridge installed on a water area includes: extending a suspended scaffold 2 installed continuously with a land on one side of the bridge or a carrying-in part 9 installed on the land to the bridge pier 1 along a bridge girder 6 of the bridge to form a carry-in passage 8 and the work scaffold 4 installed continuously with the carry-in passage 8 using the suspended scaffold 2 suspended on the bridge girder 6; installing a replacement beam 7 on the bridge pier 1; and replacing suspension by the bridge girder 6 with suspension by the replacement beam 7 with respect to suspension of the suspended scaffold 2 forming the work scaffold 4.SELECTED DRAWING: Figure 1
【課題】台船を用いることなく、水域上に架設される橋梁の橋脚の周囲に作業足場を構築する足場構築工法を提供することを目的とする。【解決手段】水域上に架設される橋梁の橋脚1の周囲に吊り足場2を用いて作業足場4を構築する足場構築工法において、前記橋梁の一側の陸地若しくは前記陸地に設けられる搬入部9に連設する吊り足場2を、前記橋梁の橋桁6に沿って前記橋脚1まで延設して、この橋桁6に吊設された吊り足場2により搬入路8と該搬入路8に連設する前記作業足場4とを形成し、前記橋脚1に受替え梁7を設け、前記作業足場4を形成する吊り足場2を前記橋桁6から前記受替え梁7に吊り替える。【選択図】図1
SCAFFOLD CONSTRUCTION METHOD
To provide a scaffold construction method for constructing a work scaffold around a bridge pier of a bridge installed on a water area, without using a barge.SOLUTION: A scaffold construction method for constructing a work scaffold 4 using a suspended scaffold 2 around a bridge pier 1 of a bridge installed on a water area includes: extending a suspended scaffold 2 installed continuously with a land on one side of the bridge or a carrying-in part 9 installed on the land to the bridge pier 1 along a bridge girder 6 of the bridge to form a carry-in passage 8 and the work scaffold 4 installed continuously with the carry-in passage 8 using the suspended scaffold 2 suspended on the bridge girder 6; installing a replacement beam 7 on the bridge pier 1; and replacing suspension by the bridge girder 6 with suspension by the replacement beam 7 with respect to suspension of the suspended scaffold 2 forming the work scaffold 4.SELECTED DRAWING: Figure 1
【課題】台船を用いることなく、水域上に架設される橋梁の橋脚の周囲に作業足場を構築する足場構築工法を提供することを目的とする。【解決手段】水域上に架設される橋梁の橋脚1の周囲に吊り足場2を用いて作業足場4を構築する足場構築工法において、前記橋梁の一側の陸地若しくは前記陸地に設けられる搬入部9に連設する吊り足場2を、前記橋梁の橋桁6に沿って前記橋脚1まで延設して、この橋桁6に吊設された吊り足場2により搬入路8と該搬入路8に連設する前記作業足場4とを形成し、前記橋脚1に受替え梁7を設け、前記作業足場4を形成する吊り足場2を前記橋桁6から前記受替え梁7に吊り替える。【選択図】図1
SCAFFOLD CONSTRUCTION METHOD
足場構築工法
SATO YUKI (Autor:in) / SASAKI KENICHI (Autor:in) / KASUGA HIDEFUMI (Autor:in) / WATANABE AKINOBU (Autor:in) / YOSHIMURA KOICHI (Autor:in)
29.08.2019
Patent
Elektronische Ressource
Japanisch
Scaffold assembly, scaffold and scaffold construction method
Europäisches Patentamt | 2023
|Frustum-shaped building construction scaffold and scaffold construction method
Europäisches Patentamt | 2021
|Frustum-shaped building construction scaffold and scaffold construction method
Europäisches Patentamt | 2021
|