ADJUSTMENT FRAME, HOUSING AND ADJUSTMENT METHOD
To provide a housing capable of appropriately adjusting the height, and an adjustment frame used for adjusting the height of the housing.SOLUTION: A housing 1 includes a housing main body 2 having an upper frame 3, a frame 4 arranged below the upper frame 3, and a bottom plate 5 arranged below the frame 4. Further, an opening 6 is provided at an upper portion of the housing body 2, and a pipe insertion portion 7 through which a water pipe is inserted is provided at a part of a side portion. The housing 1 includes an adjustment frame 9 installed on the housing main body 2. The adjustment frame 9 has an adjustment frame main body 21 that can be provided at least either between the upper frame 3 and the frame body 4 or between the frame body 4 and the bottom plate 5, and at least two sealing pieces that can be installed on the adjustment frame main body 21 so that they can be cut off. Such an adjustment frame 9 is installed between the upper frame 3 and the frame body 4 in a state where the sealing pieces are not cut off, or the frame 4 and the bottom plate 5 in a state where the sealing pieces are cut off.SELECTED DRAWING: Figure 1
【課題】適切に高さを調整できる筐体、および、その筐体の高さ調整に用いられる調整枠を提供する。【解決手段】筐体1は、上枠3、この上枠3より下方に配置された枠体4、および、この枠体4より下方に配置された底板5を有する筐体本体2を備える。また、筐体本体2の上部に開口部6を設け、かつ、側部の一部に水道管が挿通される管挿通部7を設ける。そして、筐体1は、筐体本体2に設置される調整枠9を備える。調整枠9は、上枠3と枠体4との間および枠体4と底板5との間の少なくともいずれかに設置可能な調整枠本体21と、この調整枠本体21に切除可能に設けられた少なくとも2つの封止片とを備える。このような調整枠9は、封止片が切除されていない状態で上枠3と枠体4との間に設置されるか、または、封止片が切除された状態で枠体4と底板5との間に設置される。【選択図】図1
ADJUSTMENT FRAME, HOUSING AND ADJUSTMENT METHOD
To provide a housing capable of appropriately adjusting the height, and an adjustment frame used for adjusting the height of the housing.SOLUTION: A housing 1 includes a housing main body 2 having an upper frame 3, a frame 4 arranged below the upper frame 3, and a bottom plate 5 arranged below the frame 4. Further, an opening 6 is provided at an upper portion of the housing body 2, and a pipe insertion portion 7 through which a water pipe is inserted is provided at a part of a side portion. The housing 1 includes an adjustment frame 9 installed on the housing main body 2. The adjustment frame 9 has an adjustment frame main body 21 that can be provided at least either between the upper frame 3 and the frame body 4 or between the frame body 4 and the bottom plate 5, and at least two sealing pieces that can be installed on the adjustment frame main body 21 so that they can be cut off. Such an adjustment frame 9 is installed between the upper frame 3 and the frame body 4 in a state where the sealing pieces are not cut off, or the frame 4 and the bottom plate 5 in a state where the sealing pieces are cut off.SELECTED DRAWING: Figure 1
【課題】適切に高さを調整できる筐体、および、その筐体の高さ調整に用いられる調整枠を提供する。【解決手段】筐体1は、上枠3、この上枠3より下方に配置された枠体4、および、この枠体4より下方に配置された底板5を有する筐体本体2を備える。また、筐体本体2の上部に開口部6を設け、かつ、側部の一部に水道管が挿通される管挿通部7を設ける。そして、筐体1は、筐体本体2に設置される調整枠9を備える。調整枠9は、上枠3と枠体4との間および枠体4と底板5との間の少なくともいずれかに設置可能な調整枠本体21と、この調整枠本体21に切除可能に設けられた少なくとも2つの封止片とを備える。このような調整枠9は、封止片が切除されていない状態で上枠3と枠体4との間に設置されるか、または、封止片が切除された状態で枠体4と底板5との間に設置される。【選択図】図1
ADJUSTMENT FRAME, HOUSING AND ADJUSTMENT METHOD
調整枠、筐体および調整方法
NEMOTO TAKAYUKI (Autor:in)
19.12.2019
Patent
Elektronische Ressource
Japanisch
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
Urban rail plate universal fine adjustment frame and fine adjustment method thereof