Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PREVENTION DEVICE FOR SNOW CORNICE
To provide a prevention device for a snow cornice capable of suppressing progress of snow accumulation on an upper surface of a straightening blade member better than the previous art.SOLUTION: A prevention device for a snow cornice 10 is provided with: a plurality of columns 20 placed with an interval therebetween along a longitudinal direction of a structure; and straightening blade members 30 placed between the plurality of columns 20, 20. A bracket 23 protruding in the longitudinal direction is arranged on the column 20. The straightening blade member 30 is provided with: an upper plate 31; and a lower plate 32 connected on the upper plate 31 at both ends in a lateral direction intersecting with the longitudinal direction and placed lower than the upper plate 31. A concave-like part 32C is arranged on the lower plate 32 as a securing part secured on the bracket 23 apart from the upper plate 31.SELECTED DRAWING: Figure 2
【課題】従来よりも整流羽根部材の上面における積雪の進行を抑制可能とする。【解決手段】雪庇予防装置10は、構造物の長手方向に沿って間隔を置いて設置される複数の支柱20と、複数の支柱20,20間に設置される整流羽根部材30とを備える。支柱20には、長手方向に張り出すブラケット23が設けられる。整流羽根部材30は、上部板31と、長手方向と交差する短手方向両端にて上部板31と接続され当該上部板31より下方に設けられる下部板32を備える。下部板32には、上部板31と離間されブラケット23と締結される締結部である凹状部32Cが設けられる。【選択図】図2
PREVENTION DEVICE FOR SNOW CORNICE
To provide a prevention device for a snow cornice capable of suppressing progress of snow accumulation on an upper surface of a straightening blade member better than the previous art.SOLUTION: A prevention device for a snow cornice 10 is provided with: a plurality of columns 20 placed with an interval therebetween along a longitudinal direction of a structure; and straightening blade members 30 placed between the plurality of columns 20, 20. A bracket 23 protruding in the longitudinal direction is arranged on the column 20. The straightening blade member 30 is provided with: an upper plate 31; and a lower plate 32 connected on the upper plate 31 at both ends in a lateral direction intersecting with the longitudinal direction and placed lower than the upper plate 31. A concave-like part 32C is arranged on the lower plate 32 as a securing part secured on the bracket 23 apart from the upper plate 31.SELECTED DRAWING: Figure 2
【課題】従来よりも整流羽根部材の上面における積雪の進行を抑制可能とする。【解決手段】雪庇予防装置10は、構造物の長手方向に沿って間隔を置いて設置される複数の支柱20と、複数の支柱20,20間に設置される整流羽根部材30とを備える。支柱20には、長手方向に張り出すブラケット23が設けられる。整流羽根部材30は、上部板31と、長手方向と交差する短手方向両端にて上部板31と接続され当該上部板31より下方に設けられる下部板32を備える。下部板32には、上部板31と離間されブラケット23と締結される締結部である凹状部32Cが設けられる。【選択図】図2
PREVENTION DEVICE FOR SNOW CORNICE
雪庇予防装置
TAKAHASHI YOSHIHIRO (Autor:in) / SANO JUNKO (Autor:in)
23.01.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Europäisches Patentamt | 2020
|