To provide a joint device allowing a column and a lateral stay to be easily assembled while strength of a scaffold structure is maintained.SOLUTION: A joint device is provided to connect a column and a lateral stay. The column includes a column body and a flange part having a flange hole. A joint device is provided with an upper wall part, a hook part, and a wedge. The upper wall part is provided with a wedge hole extending outward from an end part of the lateral stay and penetrated in a vertical direction therethrough. The hook part extends from an outer part further than the wedge hole on the upper wall part to a down side to be inserted in the flange hole from an upper side. The wedge is inserted from the upper side to the wedge hole and the flange hole in a way to abut an outer end part of the upper wall part and the hook part on an outer peripheral surface of the column body in a condition that the hook part is inserted in the flange hole. In this way, the upper wall part is installed on the flange part, and the flange part is positioned at a height position between an upper end and a lower end of the lateral stay.SELECTED DRAWING: Figure 11B
【課題】足場構造体の強度を維持しつつ、組み立て作業を簡易にすることができる支柱と横ステーとの連結装置を提供する。【解決手段】支柱と横ステーとを連結する連結装置が提供される。支柱は、支柱本体と、フランジ孔を有するフランジ部とを含む。連結装置は、上壁部とフック部と楔とを備える。上壁部は、横ステーの端部から外方に延び、上下方向に貫通する楔孔が形成されている。フック部は、上壁部において楔孔よりも外方の部位から下方に延び、フランジ孔に上方から差し込まれる。楔は、フック部がフランジ孔に差し込まれた状態で、上壁部の外側端部とフック部とを支柱本体の外周面に押し当てるように、楔孔及びフランジ孔に上方から差し込まれる。このとき、上壁部がフランジ部上に載置され、フランジ部が横ステーの上端と下端との間の高さ位置に位置する。【選択図】図11B
JOINT DEVICE FOR SCAFFOLD STRUCTURE
To provide a joint device allowing a column and a lateral stay to be easily assembled while strength of a scaffold structure is maintained.SOLUTION: A joint device is provided to connect a column and a lateral stay. The column includes a column body and a flange part having a flange hole. A joint device is provided with an upper wall part, a hook part, and a wedge. The upper wall part is provided with a wedge hole extending outward from an end part of the lateral stay and penetrated in a vertical direction therethrough. The hook part extends from an outer part further than the wedge hole on the upper wall part to a down side to be inserted in the flange hole from an upper side. The wedge is inserted from the upper side to the wedge hole and the flange hole in a way to abut an outer end part of the upper wall part and the hook part on an outer peripheral surface of the column body in a condition that the hook part is inserted in the flange hole. In this way, the upper wall part is installed on the flange part, and the flange part is positioned at a height position between an upper end and a lower end of the lateral stay.SELECTED DRAWING: Figure 11B
【課題】足場構造体の強度を維持しつつ、組み立て作業を簡易にすることができる支柱と横ステーとの連結装置を提供する。【解決手段】支柱と横ステーとを連結する連結装置が提供される。支柱は、支柱本体と、フランジ孔を有するフランジ部とを含む。連結装置は、上壁部とフック部と楔とを備える。上壁部は、横ステーの端部から外方に延び、上下方向に貫通する楔孔が形成されている。フック部は、上壁部において楔孔よりも外方の部位から下方に延び、フランジ孔に上方から差し込まれる。楔は、フック部がフランジ孔に差し込まれた状態で、上壁部の外側端部とフック部とを支柱本体の外周面に押し当てるように、楔孔及びフランジ孔に上方から差し込まれる。このとき、上壁部がフランジ部上に載置され、フランジ部が横ステーの上端と下端との間の高さ位置に位置する。【選択図】図11B
JOINT DEVICE FOR SCAFFOLD STRUCTURE
足場構造体のための連結装置
KAWAHISA AKIHIRO (Autor:in) / SHIMAOKA DAISUKE (Autor:in)
06.02.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
JOINT DEVICE OF SCAFFOLD COMPONENT MEMBER IN SUSPENDED SCAFFOLD