CONSTRUCTION METHOD OF FALL-PREVENTION NET STRUCTURE, FALL-PREVENTION NET STRUCTURE AND FIXTURE WITH FALL-PREVENTION NET STRUCTURE
To enable fall-prevention net installation to be performed safely and fast.SOLUTION: A construction method of a fall-prevention net structure of the invention has a mounting process to parallel multiple first wires 10 to each other on a building wall B, a process to move a net unit 26 in which second wires 12 are mounted in advance to the periphery of a net 11 formed into a mesh shape to the same height as the first wires 10 mounted in the horizontal direction, and a process to deploy the second wires 12 of the net unit 26 which has been moved, so as to be adjacent to the first wires 10 provided on the wall surface of the building B, and connect the two wires using multiple fixtures 2.SELECTED DRAWING: Figure 3
【課題】落下防止ネットの設置作業をより安全且つ短時間に実施可能とする。【解決手段】本発明の落下防止ネット構造の施工方法は、建物Bの壁面に、第1のワイヤ10を複数互いに平行となるように取り付ける工程と、網目状に形成されたネット11の周縁に第2のワイヤ12が予め取り付けられたネットユニット26を、水平方向に沿うように取り付けられた第1のワイヤ10と同じ高さまで移動させる工程と、移動させられたネットユニット26の第2のワイヤ12を、建物Bの壁面に設けられた第1のワイヤ10に隣接するように配備させ、両ワイヤを複数の固定金具2を用いて連結させる工程と、を有することを特徴とする。【選択図】図3
CONSTRUCTION METHOD OF FALL-PREVENTION NET STRUCTURE, FALL-PREVENTION NET STRUCTURE AND FIXTURE WITH FALL-PREVENTION NET STRUCTURE
To enable fall-prevention net installation to be performed safely and fast.SOLUTION: A construction method of a fall-prevention net structure of the invention has a mounting process to parallel multiple first wires 10 to each other on a building wall B, a process to move a net unit 26 in which second wires 12 are mounted in advance to the periphery of a net 11 formed into a mesh shape to the same height as the first wires 10 mounted in the horizontal direction, and a process to deploy the second wires 12 of the net unit 26 which has been moved, so as to be adjacent to the first wires 10 provided on the wall surface of the building B, and connect the two wires using multiple fixtures 2.SELECTED DRAWING: Figure 3
【課題】落下防止ネットの設置作業をより安全且つ短時間に実施可能とする。【解決手段】本発明の落下防止ネット構造の施工方法は、建物Bの壁面に、第1のワイヤ10を複数互いに平行となるように取り付ける工程と、網目状に形成されたネット11の周縁に第2のワイヤ12が予め取り付けられたネットユニット26を、水平方向に沿うように取り付けられた第1のワイヤ10と同じ高さまで移動させる工程と、移動させられたネットユニット26の第2のワイヤ12を、建物Bの壁面に設けられた第1のワイヤ10に隣接するように配備させ、両ワイヤを複数の固定金具2を用いて連結させる工程と、を有することを特徴とする。【選択図】図3
CONSTRUCTION METHOD OF FALL-PREVENTION NET STRUCTURE, FALL-PREVENTION NET STRUCTURE AND FIXTURE WITH FALL-PREVENTION NET STRUCTURE
落下防止ネット構造の施工方法、落下防止ネット構造、及び落下防止ネット構造に備えられる固定金具