To provide a support fixing method capable of firmly erecting a support used for an outdoor handrail, a site fence or the like in a short period of time without wasting a finished site construction work as much as possible.SOLUTION: After a core 6 is opened in the vertical direction and the lower end side of a support base material 3 constituted of a single pipe 31 and a conical metal fitting 32 as a driving metal fitting is inserted into the core 6, the tip part of the support base material 3 is driven into the ground to stand independently. Next, before a grout material injected into a gap 75 is hardened in the core 6, a support main body 2 is inserted into the support base material 3, the lower end side of the support main body 2 is arranged in the core 6, and a gap 76 is filled with the grout material and the grout material is hardened. Thereafter, as shown in FIG. 7, the upper end opening of the support main body 2 is filled with the grout material 4 to a height exceeding the top end of the single pipe 31 accommodated in the support main body 2, and the grout material is hardened, at this time, the grout material 4 passing through the inside of the single pipe 31 penetrates into the soil around the tip through a gap 5, and is hardened to solidify.SELECTED DRAWING: Figure 7
【課題】屋外用手すりや外構フェンス等に用いられる支柱を、施工済みの外構工事を可及的に無駄にすることなく、短期間で、堅固に立設することが可能な支柱固定方法を提供する。【解決手段】コア6を鉛直方向に空けて、単管31及び打込用金物としての円錐状金物32により構成される支柱基材3の下端側をコア6内に挿入した後、支柱基材3の先端部を地中に打ち込んで自立させる。次に、隙間75に注入したグラウト材がコア6内で硬化する前に支柱基材3に対して支柱本体2を挿入して支柱本体2の下端側をコア6内に配置し、隙間76にグラウト材を充填して硬化させる。その後、図7に示すように、支柱本体2の内部に収容された単管31の天端を超える高さまで、支柱本体2の上端開口部内にグラウト材4を充填して硬化させるが、この際、単管31の内部を通ったグラウト材4が空隙5を通って先端周辺の土中に浸透し、硬化して根固めする。【選択図】図7
To provide a support fixing method capable of firmly erecting a support used for an outdoor handrail, a site fence or the like in a short period of time without wasting a finished site construction work as much as possible.SOLUTION: After a core 6 is opened in the vertical direction and the lower end side of a support base material 3 constituted of a single pipe 31 and a conical metal fitting 32 as a driving metal fitting is inserted into the core 6, the tip part of the support base material 3 is driven into the ground to stand independently. Next, before a grout material injected into a gap 75 is hardened in the core 6, a support main body 2 is inserted into the support base material 3, the lower end side of the support main body 2 is arranged in the core 6, and a gap 76 is filled with the grout material and the grout material is hardened. Thereafter, as shown in FIG. 7, the upper end opening of the support main body 2 is filled with the grout material 4 to a height exceeding the top end of the single pipe 31 accommodated in the support main body 2, and the grout material is hardened, at this time, the grout material 4 passing through the inside of the single pipe 31 penetrates into the soil around the tip through a gap 5, and is hardened to solidify.SELECTED DRAWING: Figure 7
【課題】屋外用手すりや外構フェンス等に用いられる支柱を、施工済みの外構工事を可及的に無駄にすることなく、短期間で、堅固に立設することが可能な支柱固定方法を提供する。【解決手段】コア6を鉛直方向に空けて、単管31及び打込用金物としての円錐状金物32により構成される支柱基材3の下端側をコア6内に挿入した後、支柱基材3の先端部を地中に打ち込んで自立させる。次に、隙間75に注入したグラウト材がコア6内で硬化する前に支柱基材3に対して支柱本体2を挿入して支柱本体2の下端側をコア6内に配置し、隙間76にグラウト材を充填して硬化させる。その後、図7に示すように、支柱本体2の内部に収容された単管31の天端を超える高さまで、支柱本体2の上端開口部内にグラウト材4を充填して硬化させるが、この際、単管31の内部を通ったグラウト材4が空隙5を通って先端周辺の土中に浸透し、硬化して根固めする。【選択図】図7
SUPPORT FIXING METHOD
支柱固定方法
YOSHIDA TSUTOMU (Autor:in)
02.04.2020
Patent
Elektronische Ressource
Japanisch
SUPPORT COLUMN FIXING METHOD AND SUPPORT COLUMN FIXING SOCKET
Europäisches Patentamt | 2020
|Fixing support on inclined steel structure and construction method of fixing support
Europäisches Patentamt | 2023
|SUPPORT COLUMN FIXING METHOD AND FIXING TOOL USED THEREFOR
Europäisches Patentamt | 2015
|Fixing structure for building bridge support and fixing method of fixing structure
Europäisches Patentamt | 2023
|