Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
INSTALLATION METHOD FOR MOVING SCAFFOLD
To provide a method for safely installing suspension scaffolds for repairing a viaduct beam constructed on an in-service railway or road without restricting the traffic of the railway or road.SOLUTION: An installation method for moving scaffold that extends a basic scaffold 10 comprising a hanging metal fitting 13 suspended on a moving rail 54, and a basic panel 11 suspended on the hanging metal fitting 13, extends the basic scaffold 10 by repeating steps of: attaching the moving rail 54 under a structure 60; suspending the basic scaffold 10 below the moving rail 54; connecting an additional rail 54b to a tip 54a of the moving rail 54; moving the basic scaffold 10 in the direction of the tip 54a along the additional rail 54b; and connecting an additional panel 12 to a rear end part 10b of the basic scaffold 10.SELECTED DRAWING: Figure 2
【課題】鉄道や道路等の交通規制をすることなく、供用中の鉄道や道路上に構築されている高架橋梁の補修等のための吊り足場を安全に設置する方法を提供することである。【解決手段】移動用レール54に吊設された吊金具13と、前記吊金具13に吊り下げられる基本パネル11と、を備えた基本足場10を拡張する移動用足場の設置方法であって、構造物60の下に移動用レール54を取り付ける工程と、前記移動用レール54の下方に基本足場10を吊設する工程と、前記移動用レール54の先端部54aに追加レール54bを連接する工程と、前記基本足場10を前記追加レール54bに沿って先端部54a方向に移動させる工程と、前記基本足場10の後端部10bに追加パネル12を連接する工程と、を備え、前記工程を繰り返して基本足場10を拡張することを特徴とする移動用足場の設置方法。【選択図】図2
INSTALLATION METHOD FOR MOVING SCAFFOLD
To provide a method for safely installing suspension scaffolds for repairing a viaduct beam constructed on an in-service railway or road without restricting the traffic of the railway or road.SOLUTION: An installation method for moving scaffold that extends a basic scaffold 10 comprising a hanging metal fitting 13 suspended on a moving rail 54, and a basic panel 11 suspended on the hanging metal fitting 13, extends the basic scaffold 10 by repeating steps of: attaching the moving rail 54 under a structure 60; suspending the basic scaffold 10 below the moving rail 54; connecting an additional rail 54b to a tip 54a of the moving rail 54; moving the basic scaffold 10 in the direction of the tip 54a along the additional rail 54b; and connecting an additional panel 12 to a rear end part 10b of the basic scaffold 10.SELECTED DRAWING: Figure 2
【課題】鉄道や道路等の交通規制をすることなく、供用中の鉄道や道路上に構築されている高架橋梁の補修等のための吊り足場を安全に設置する方法を提供することである。【解決手段】移動用レール54に吊設された吊金具13と、前記吊金具13に吊り下げられる基本パネル11と、を備えた基本足場10を拡張する移動用足場の設置方法であって、構造物60の下に移動用レール54を取り付ける工程と、前記移動用レール54の下方に基本足場10を吊設する工程と、前記移動用レール54の先端部54aに追加レール54bを連接する工程と、前記基本足場10を前記追加レール54bに沿って先端部54a方向に移動させる工程と、前記基本足場10の後端部10bに追加パネル12を連接する工程と、を備え、前記工程を繰り返して基本足場10を拡張することを特徴とする移動用足場の設置方法。【選択図】図2
INSTALLATION METHOD FOR MOVING SCAFFOLD
移動用足場の設置方法
KAWAKITA WATARU (Autor:in) / YAMASHITA KAZUKI (Autor:in) / YOSHIBAYASHI KATSUMI (Autor:in)
16.04.2020
Patent
Elektronische Ressource
Japanisch
SCAFFOLD INSTALLATION METHOD AND SCAFFOLD INSTALLATION STRUCTURE
Europäisches Patentamt | 2019
|SCAFFOLD DEVICE AND INSTALLATION METHOD OF SCAFFOLD DEVICE
Europäisches Patentamt | 2018
|