GROUND IMPROVEMENT METHOD OF ASH-DISPOSAL SITE
To efficiently improve the ground in an area covered with retained water over the deposited ash.SOLUTION: The ground improvement method of the ash disposal site in a state that used coal accumulated ash 102 is accumulated and retained water 102b covers the accumulated ash 102, includes the steps of: installing a partitioning frame 300 surrounding a target area for ground improvement in the ash disposal site; supplying a solidifying material 400 into the retained water 102b in the partitioning frame 300; stirring the retained water 102b in the partitioning frame 300; and draining the retained water 102b out of the partitioning frame 300. With this, the ground in the target area defined by partitioning frame 300 is improved.SELECTED DRAWING: Figure 1
【課題】堆積灰上に滞水したエリアを効率的に地盤改良できること。【解決手段】使用済みの石炭の堆積灰102が堆積し、堆積灰102上に滞水102bが張られた状態の灰処分場の地盤改良方法であって、灰処分場のうち地盤改良する対象範囲を囲む仕切り枠300を設置し、仕切り枠300内の滞水102bに固化材400を投入し、仕切り枠300内の滞水102bを攪拌し、仕切り枠300内の滞水102bを排水することで、仕切り枠300で規定した対象範囲を地盤改良できる。【選択図】図1
GROUND IMPROVEMENT METHOD OF ASH-DISPOSAL SITE
To efficiently improve the ground in an area covered with retained water over the deposited ash.SOLUTION: The ground improvement method of the ash disposal site in a state that used coal accumulated ash 102 is accumulated and retained water 102b covers the accumulated ash 102, includes the steps of: installing a partitioning frame 300 surrounding a target area for ground improvement in the ash disposal site; supplying a solidifying material 400 into the retained water 102b in the partitioning frame 300; stirring the retained water 102b in the partitioning frame 300; and draining the retained water 102b out of the partitioning frame 300. With this, the ground in the target area defined by partitioning frame 300 is improved.SELECTED DRAWING: Figure 1
【課題】堆積灰上に滞水したエリアを効率的に地盤改良できること。【解決手段】使用済みの石炭の堆積灰102が堆積し、堆積灰102上に滞水102bが張られた状態の灰処分場の地盤改良方法であって、灰処分場のうち地盤改良する対象範囲を囲む仕切り枠300を設置し、仕切り枠300内の滞水102bに固化材400を投入し、仕切り枠300内の滞水102bを攪拌し、仕切り枠300内の滞水102bを排水することで、仕切り枠300で規定した対象範囲を地盤改良できる。【選択図】図1
GROUND IMPROVEMENT METHOD OF ASH-DISPOSAL SITE
灰処分場の地盤改良方法
IKEDA RYOJI (Autor:in) / SHIGEKAWA YOSHINOBU (Autor:in) / HINO KAZUTOSHI (Autor:in) / HIROKANE SHUJI (Autor:in)
09.07.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Ground Water and Contaminant Transport at a Coal Ash Disposal Site
British Library Conference Proceedings | 1995
|DMS disposal site reassessment
Online Contents | 1995